• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, February 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    US $10b Project Vault indirectly targets Namibia’s critical minerals

    US $10b Project Vault indirectly targets Namibia’s critical minerals

    Kombat Mine to restart in 2026 as construction begins on historic copper asset

    Kombat Mine to restart in 2026 as construction begins on historic copper asset

    Namibia’s first cobalt project could be sold

    Celsius Resources to delist from NSX while divesting from Opuwo Cobalt Project

    Okanjande care-and-maintenance costs decrease, but restart date still unknown

    Northern Graphite hiring signals renewed push to restart Okanjande

    Namibia’s chrome potential

    Cheng Du Ao Hua Exploration Engineering gets 3 million performance rights linked to Kameelburg

    Chinese state-backed CNNC arm commits N$6.1bn to develop Bannerman’s Etango uranium project

    The Great Oil Rewiring: Are We Building a Nation or a Single Point of Failure?

    The Great Oil Rewiring: Are We Building a Nation or a Single Point of Failure?

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich delivers N$2.6bn in half-year revenue after selling 1.96 million pounds of uranium oxide

    Golden Deeps uncovers bonanza-grade copper and silver beneath Graceland gossans near Tsumeb

    Golden Deeps uncovers bonanza-grade copper and silver beneath Graceland gossans near Tsumeb

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope

by Editor
February 19, 2026
in Gold
0
B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope
501
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

B2Gold has committed more than US$14 million (about N$260 million) to exploration at the Otjikoto Gold Mine over 2025 and 2026, with drilling focused on advancing the Antelope deposit while supporting underground production planning at Wolfshag as the operation transitions away from open-pit mining.

In 2025, B2Gold Corp spent approximately US$8 million (around N$150 million) on exploration at Otjikoto, completing 35,924 metres of diamond and reverse-circulation drilling across the mine area.

The exploration programme was primarily directed at the Antelope deposit, while drilling within the broader Otjikoto underground mining footprint supported geological confidence and mine planning at Wolfshag.

The Antelope deposit, located about three kilometres south of the main Otjikoto pit, comprises the Springbok Zone, the Oryx Zone and a potential third structure, Impala, subject to confirmatory drilling.

It was discovered in 2022 following deep drill testing guided by three-dimensional modelling of airborne magnetic data.

Results from the 2025 drilling campaign underpinned the company’s September 2025 decision to approve development of the Antelope underground deposit, following optimisation work that reduced the project’s estimated pre-production capital requirements.

Ongoing drilling and geological work in and around the Wolfshag underground mine continue to support mine design, scheduling and grade confidence as underground operations ramp up following the end of open-pit mining.

Exploration activity will continue in 2026, with US$6 million (about N$110 million) budgeted and approximately 44,000 metres of drilling planned.

The programme is expected to focus on further expanding and refining the Antelope resource while continuing geological work within the Otjikoto underground mining area, including Wolfshag.

Together, the US$14 million (≈ N$260 million) exploration commitment over 2025 and 2026 is aimed at securing sufficient underground ounces at both Wolfshag and Antelope to underpin Otjikoto’s production profile and cash generation in the post–open pit phase of the mine’s life.

Share200Tweet125
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
EU invokes Critical Raw Materials Act to ring-fence Namibia’s lithium

EU invokes Critical Raw Materials Act to ring-fence Namibia’s lithium

February 19, 2026
Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

Otjikoto delivers N$13 billion revenue as 2025 gold output nears 200,000 ounces

February 19, 2026
B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope

B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope

February 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In