• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, November 8, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

    Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

    Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

    Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

    Teach farmers to co-exist with mining – parliamentary committee on Omaheke exploration

    IAEA calls for more groundwater tests at Uranium One’s Wings project

    Skeleton Coast Uranium raises C$2.3 million for Namibia exploration

    Skeleton Coast Uranium raises C$2.3 million for Namibia exploration

    Paladin’s Namibia after-tax profit rises from US$1.8m to US$8.1m in September quarter

    Paladin’s Namibia after-tax profit rises from US$1.8m to US$8.1m in September quarter

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Paladin banks on J Pit to meet 5.1 million to 5.6 million pound uranium target at Langer Heinrich

    Nandi-Ndaitwah says bureaucracy nearly cost Namibia US$2.5 billion Dangote investment

    Nandi-Ndaitwah says bureaucracy nearly cost Namibia US$2.5 billion Dangote investment

    Dangote wants more investment opportunities in Namibia after US$2.5 billion commitment

    Dangote wants more investment opportunities in Namibia after US$2.5 billion commitment

    Swakop Uranium plans three-pit uranium mine on 130 km² in Erongo

    Swakop Uranium plans three-pit uranium mine on 130 km² in Erongo

    Core Energy brings in Torque Drilling for Barking Gecko campaign

    Core Energy brings in Torque Drilling for Barking Gecko campaign

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Gold

B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope

by Editor
February 19, 2026
in Gold
0
B2Gold commits N$260m to underground exploration at Otjikoto for Wolfshag and Antelope
535
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

B2Gold has committed more than US$14 million (about N$260 million) to exploration at the Otjikoto Gold Mine over 2025 and 2026, with drilling focused on advancing the Antelope deposit while supporting underground production planning at Wolfshag as the operation transitions away from open-pit mining.

In 2025, B2Gold Corp spent approximately US$8 million (around N$150 million) on exploration at Otjikoto, completing 35,924 metres of diamond and reverse-circulation drilling across the mine area.

The exploration programme was primarily directed at the Antelope deposit, while drilling within the broader Otjikoto underground mining footprint supported geological confidence and mine planning at Wolfshag.

The Antelope deposit, located about three kilometres south of the main Otjikoto pit, comprises the Springbok Zone, the Oryx Zone and a potential third structure, Impala, subject to confirmatory drilling.

It was discovered in 2022 following deep drill testing guided by three-dimensional modelling of airborne magnetic data.

Results from the 2025 drilling campaign underpinned the company’s September 2025 decision to approve development of the Antelope underground deposit, following optimisation work that reduced the project’s estimated pre-production capital requirements.

Ongoing drilling and geological work in and around the Wolfshag underground mine continue to support mine design, scheduling and grade confidence as underground operations ramp up following the end of open-pit mining.

Exploration activity will continue in 2026, with US$6 million (about N$110 million) budgeted and approximately 44,000 metres of drilling planned.

The programme is expected to focus on further expanding and refining the Antelope resource while continuing geological work within the Otjikoto underground mining area, including Wolfshag.

Together, the US$14 million (≈ N$260 million) exploration commitment over 2025 and 2026 is aimed at securing sufficient underground ounces at both Wolfshag and Antelope to underpin Otjikoto’s production profile and cash generation in the post–open pit phase of the mine’s life.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

Nandi-Ndaitwah acknowledges communication gaps over petroleum plans

November 7, 2026
Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

Eastport uncovers copper and gold mineralisation at Matsitama in Botswana

November 6, 2026
Teach farmers to co-exist with mining – parliamentary committee on Omaheke exploration

IAEA calls for more groundwater tests at Uranium One’s Wings project

November 6, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe