• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, June 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Arkle set to drill after confirming uranium across Erongo targets

    Arkle set to drill after confirming uranium across Erongo targets

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Andrada intersects lithium grades of up to 3.02% Li₂O at Lithium Ridge

by Editor
February 10, 2026
in Lithium
0
Andrada unlocks N$190m for Brandberg West development stage
540
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining Limited has intersected lithium grades of up to 3.02% Li₂O at its Lithium Ridge project in Namibia.

This confirms continuity of mineralisation from surface to depths of up to 160 metres and highlights significant tin and tantalum by-product potential from the company’s inaugural diamond drilling programme.

The results come from the first batch of drilling completed under the Stage 1 exploration programme at Lithium Ridge, which is being advanced in partnership with Sociedad Química y Minera de Chile through its subsidiary SQM Australia.

The programme forms part of an earn-in agreement under which SQM may earn a 30% interest in the project.

Drilling has intersected consistent lithium mineralisation in most of the holes reported, with standout results including 9.63 metres at 2.12% Li₂O from 36.66 metres in hole LRD003, including a higher-grade interval of 5.74 metres at 3.02% Li₂O.

Hole LRD010 returned 24.44 metres at 1.38% Li₂O from 55.44 metres, including 14.57 metres at 1.73% Li₂O, while hole LRD011 intersected 16.81 metres at 1.51% Li₂O from 68.30 metres.

The drilling has also confirmed compelling polymetallic upside, with notable tin and tantalum intersections including 2.57 metres at 1.98% tin and 227 ppm tantalum in hole LRD001, and 0.89 metres at 1.33% tin and 247 ppm tantalum in hole LRD011.

Andrada said these associated metals are considered indicative of lithium-bearing pegmatites and could enhance future project economics.

The Stage 1 programme commenced in August 2025 and is designed to include approximately 14,000 metres of oriented diamond drilling across 120 planned holes.

The results reported to date are from the first 15 holes, totalling 1,328 metres of drilling and 496 samples submitted for analysis.

All reported intersections represent apparent widths, as drilling was completed at inclined angles.

Spodumene has been visually identified as the primary lithium mineral within the pegmatites, with mineralisation extending from the surface and remaining open at depth.

Andrada said drilling is continuing on schedule, with regular updates expected as further assay results are received and additional pegmatites are identified through ongoing geological mapping.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

June 26, 2026
Aldoro secures funding and new drill rig for expanded Kameelburg program

Aldoro prepares for resource update after intersecting a record 542.9m at 1.38% TREO at Kameelburg

June 26, 2026
Arkle set to drill after confirming uranium across Erongo targets

Arkle set to drill after confirming uranium across Erongo targets

June 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In