• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, November 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Serval repays £1m debt on Namibia and Botswana copper assets

    Serval repays £1m debt on Namibia and Botswana copper assets

    Vantage hits 2.32% copper at Chanoga prospect in Botswana

    Vantage hits 2.32% copper at Chanoga prospect in Botswana

    50 cyclists to race through Otjihase copper mine’s underground tunnels

    50 cyclists to race through Otjihase copper mine’s underground tunnels

    BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    Bank of Namibia grants conditional approval for US$15m Opuwo cobalt project sale

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

88 Energy steps up pre-drill studies at PEL 93 in Owambo Basin

by Editor
January 30, 2026
in Oil & Gas
0
88 Energy targets 2026 for first exploration well in Owambo basin
529
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

88 Energy reveals that pre-risking is underway at PEL 93, where the company holds a 20% working interest, following regulatory approval for a licence extension and the rollout of a defined technical work programme aimed at maturing drill-ready targets.
The mines ministry granted a 12-month extension to the First Renewal Exploration Period for PEL 93, pushing the licence expiry date out to October 2026.
The extension provides additional time for the joint venture to complete pre-drill de-risking activities and progress lead maturation across the permit.
A high-resolution gravity survey is scheduled for the first quarter of calendar year 2026, focusing on the southern portion of PEL 93 where multiple structural leads have already been identified.
The survey is intended to improve subsurface imaging and refine the interpretation of basin architecture ahead of further exploration decisions.
JV partner and operator Monitor Exploration will also conduct an airborne geophysical survey across PEL 93 during 2026.
The programme will acquire high-resolution magnetic and gravity data to enhance subsurface definition, better constrain basin geometry and identify structural features critical to hydrocarbon prospectivity. The joint venture expects this work to materially improve prospect mapping and support the maturation of drill-ready targets before any exploration drilling.
The forward work programme for PEL 93 includes defining the prospective resource potential of identified leads, advancing discussions with potential farm-in partners to support the next phase of exploration, and preparing for future seismic acquisition while finalising drilling targets.
At 31 December 2025, 88 Energy reported a cash balance of A$6.8 million, equivalent to about US$4.4 million.
Exploration and evaluation expenditure for the quarter totalled approximately A$0.4 million, down from A$0.6 million in the September quarter, reflecting spending on well permitting and planning, analysis of newly secured leases and PEL 93 work programme activities.
Staff and administration costs during the period were about A$0.9 million, compared with A$1.1 million in the previous quarter, and included director and consulting fees of roughly A$0.2 million.
The company also paid a 20% deposit of approximately A$0.2 million in relation to newly acquired leases.
Regional exploration activity has provided additional support for the geological model underpinning PEL 93. In December 2025, Reconnaissance Energy Africa announced positive results from its Kavango West-1X exploration well on PEL 73, located within the same Damara Fold Belt play fairway.
ReconAfrica reported about 400 metres of gross hydrocarbon-bearing section within the Otavi carbonate sequence, including 64 metres of net hydrocarbon pay confirmed by wireline logs and supported by mud-log anomalies.
Additional hydrocarbon shows were identified in deeper fractured limestone intervals, with production testing planned for the first quarter of 2026.
Structural trends associated with the carbonate reservoir targets intersected at Kavango West-1X are interpreted to extend eastwards toward PEL 93, which lies roughly 200 kilometres away.
The confirmation of net pay and the decision to proceed to production testing reinforce the potential of Otavi carbonate-hosted structural closures within PEL 93, where 11 comparable leads have been mapped.

Share212Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Serval repays £1m debt on Namibia and Botswana copper assets

Serval repays £1m debt on Namibia and Botswana copper assets

November 27, 2026
Vantage hits 2.32% copper at Chanoga prospect in Botswana

Vantage hits 2.32% copper at Chanoga prospect in Botswana

November 27, 2026
Kendrick confirms heavy rare earth oxide grades of up to 0.24% at Teufelskuppe

Kendrick confirms heavy rare earth oxide grades of up to 0.24% at Teufelskuppe

November 27, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe