• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Andrada identifies peak value of 4.67% Li₂O, at its Lithium Ridge project

by Editor
January 26, 2026
in Lithium
0
Andrada Mining’s revenue up 22% to £10.80 million
520
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has identified multiple surface samples grading above 4% lithium oxide, with a peak value of 4.67% Li₂O, at its Lithium Ridge project in Namibia, confirming the presence of a high-grade lithium system as exploration drilling advances.
The AIM-listed tin producer said comprehensive geological mapping and grab sampling across the Lithium Ridge licence area, undertaken in partnership with Sociedad Química y Minera de Chile SA through its subsidiary SQM Australia, returned exceptional lithium grades and validated the scale of mineralisation ahead of ongoing drilling.
The surface work supports Andrada’s Stage 1 drilling programme, which SQM is funding under an earn-in agreement that allows the Chilean group to acquire a 30% interest in the project. High-grade laboratory results were recorded across multiple pegmatite bodies along the mineralised trend, reinforcing Lithium Ridge’s footprint and upside potential.
In addition to lithium, the programme confirmed significant polymetallic mineralisation. Individual samples returned tin grades of up to 3.12% Sn and tantalum values of up to 905 parts per million, highlighting the potential for by-product credits that could enhance future project economics.
Spodumene has been confirmed as the primary lithium-bearing mineral, consistent with earlier drilling and sampling programmes. Visual identification of lithium minerals, supported by handheld Raman spectroscopy, indicates that mineralisation extends well beyond the areas initially targeted.
Chief executive officer Anthony Viljoen said the results provide strong validation of Lithium Ridge’s quality and scale. “Surface samples returning lithium grades in excess of 4% Li₂O, together with the confirmation of spodumene as the primary lithium mineral, reinforces our view that Lithium Ridge hosts a large, high-quality lithium system,” Viljoen said.
“The presence of meaningful tin and tantalum grades alongside the lithium mineralisation highlights the polymetallic nature of the project and its capacity to deliver by-product credits that could enhance future project economics,” he said.
Viljoen said Lithium Ridge demonstrates the broader regional upside within Andrada’s portfolio, even as expansion activities continue at the company’s flagship Uis mine. He said the company is looking forward to receiving the first assay results from the Stage 1 drilling programme, which is advancing on schedule.
The mapping and sampling programme systematically covered the entire licence area, with more than 1,500 outcropping pegmatites mapped to date. Of the 496 grab samples analysed so far, 115 returned grades above 1% Li₂O, including 83 samples grading above 2% Li₂O. A further 156 samples returned tin grades above 0.1%, while 165 samples recorded tantalum values above 75 ppm.
The results confirm ore-grade lithium potential across numerous pegmatites that had not previously been drilled or sampled, and demonstrate that many of these bodies host significant tin and tantalum mineralisation.
Sampling was conducted by qualified geological teams, with locations recorded using handheld GPS devices. Sample preparation was completed at SA Labs Ithuba, with geochemical analysis undertaken at UIS Analytical Services. Lithium and major elements were analysed using sodium peroxide fusion with ICP-OES, while tin, tantalum and trace elements were determined using lithium borate fusion with ICP-MS. Andrada said quality assurance and quality control procedures were reviewed and found to be compliant.
The Stage 1 drilling programme commenced in the third quarter of 2025 and includes approximately 14,000 metres of oriented core drilling across about 120 drill holes. A third diamond drill rig was mobilised to the site in November 2025 to accelerate progress.
The technical data has been reviewed by Professor Laurence Robb, a non-executive director of Andrada, who has more than 30 years’ experience in exploration and economic geology and acts as the Competent Person for the reporting of exploration results.

 

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Northern Graphite plans Okanjande mine restart in 2027

Northern Graphite plans Okanjande mine restart in 2027

April 21, 2026
Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

Multi-project oil province forms as FID timelines align for 2026–2027

April 20, 2026
Hardwire oil wealth into law to avoid missed opportunity — McLeod

Hardwire oil wealth into law to avoid missed opportunity — McLeod

April 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In