• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, August 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy proposes surrendering half of PEL 93

    Equinor targets ‘pretty big’ Namibia oil discovery

    Equinor targets ‘pretty big’ Namibia oil discovery

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Koryx hits 969m at 0.27% copper equivalent at Haib

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Langer Heinrich uranium revenue jumps 71% to US$304m

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada hits 24 metres at 2% lithium at Lithium Ridge

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy on NSX from Wednesday

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    ReconAfrica targets October for 1,000m horizontal test at Kavango West

    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Tower waits on minister’s signature to unlock PEL 96 farm-out payment

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Silica quarry project that will feed Tsumeb smelter gets approval

by Editor
December 8, 2025
in Magazine
0
Silica quarry project that will feed Tsumeb smelter gets approval
531
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

A newly approved silica quarry west of Tsumeb may appear modest on paper, but it represents a critical link in Namibia’s metals value chain — one that feeds directly into the country’s only copper smelter and one of just five commercial-scale smelters on the African continent.

Three Musketeers Investment (Pty) Ltd has secured environmental clearance to develop Mining Claim 73963 at Farm !Uris No. 481.

From a 17.6-hectare footprint, the company plans to extract between 1,500 and 3,000 tonnes of silica gravel per month, supplying the Sinomine-owned Tsumeb smelter, previously operated for more than a decade by Dundee Precious Metals.

With approval formalised under ECC-105-568-REP-06-D on 2 May 2025, the operation is expected to run for ten years.

The quarry lies just 15 kilometres from Tsumeb, a short haul that sharply reduces transport cost and keeps metallurgy stable inside the smelter — a detail more important than it may sound.

Silica, or SiO₂, is the invisible backbone of furnace chemistry. It binds with waste material to form molten slag, allowing copper to separate cleanly during processing.

When silica is available in consistent quality, furnaces run at lower temperatures, slag remains stable, equipment lasts longer, and blister copper emerges with fewer impurities.

When it isn’t, energy use climbs, slag weakens, and plant economics erode. That is why this quarry matters. It is not a pit of sand — it is smelter insurance.

The Tsumeb smelter, built in the early 1960s, remains Namibia’s oldest continuously operating metallurgical asset.

Linked by rail to Walvis Bay, it processes concentrate from regional mines into 98.5% blister copper for export to refineries in Europe and Asia, while arsenic trioxide — a by-product — meets global demand in the chemical and timber treatment industries.

Without silica, the smelter could continue, but at greater cost, higher temperature and shorter furnace life.

Under the new arrangement, Sinomine expects to employ around ten workers, prioritising Tsumeb residents.

A forest permit will precede clearing of the 17.6-hectare footprint and irrigation on Farm !Uris will continue separately under an existing water-use agreement with Consolidated Copper Corp, owner of the adjacent Tschudi mine.

If all of this sounds routine, the larger context is not. Namibia is stepping into a rapidly expanding global silica market, driven by construction, industrial uses, and growing demand for solar-panel glass.

China, India and the United States lead production by scale — but Namibia is not trying to out-mine giants. Instead, it has something they do not: proximity to smelters and silica-rich deposits with purity ranging from 85% to 99% in some places.

 

Share212Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Uis emerges as southern Africa’s fourth most important tech-metals mine

Andrada turns cash positive, but loss widens to £10.7m

August 28, 2026
Bezant to seek permission to seal the Namib Lead deal

Bezant brings forward NLZM US$5m plant payment as Hope & Gorob targets September production

August 28, 2026
88 Energy targets 2026 for first exploration well in Owambo basin

88 Energy proposes surrendering half of PEL 93

August 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In