• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect

by Editor
August 20, 2025
in Uranium
0
Connected Minerals starts Phase 2 drilling at Etango North-East’s Ondapanda prospect
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Connected Minerals has begun Phase 2 reverse-circulation drilling at its Etango North-East uranium project in Namibia, mobilising Hammerstein Drilling on 18 August to focus on the Ondapanda prospect.

The programme comprises up to 18 holes, totalling approximately 2,800 metres, designed as extensional and infill work following a strong maiden campaign in May.

Management says mineralisation remains open at depth and along strike.

Phase 1 returned economic uranium grades in 14 of 15 holes.

Reported highlights included 5 metres at 358 ppm eU3O8 from 88 metres in hole OPRC0008, with 2 metres at 643 ppm and 1 metre at 814 ppm from 89 metres; 4 metres at 230 ppm from 47 metres in OPRC0010, including 2 metres at 283 ppm and 1 metre at 345 ppm; 3 metres at 237 ppm from 122 metres in OPRC0003, including 1 metre at 302 ppm; 3 metres at 312 ppm from 68 metres in OPRC0006, including 1 metre at 340 ppm; and 3 metres at 249 ppm from 129 metres in OPRC0015, including 1 metre at 319 ppm. The company interprets multiple, stacked mineralised alaskites (leucogranites) across Ondapanda.

Geological work to date suggests the Etango North-East mineral system follows the same alaskite model seen at Bannerman Energy’s nearby Etango project, which is underpinned by a definitive feasibility study citing 429 million tonnes at 225 ppm U3O8. Ondapanda’s Phase 2 programme aims to build on Phase 1 intercepts, test depth extensions, and refine drill spacing to inform follow-up targeting.

Managing director Warrick Clent said the team is “eager to see the results from Phase 2 given our initial success in Phase 1,” adding that the second-round programme is structured to grow the footprint of mineralisation while improving confidence around the better-graded zones.

The Etango North-East work is the company’s Namibian focus as it advances towards defining scale and continuity at Ondapanda.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In