• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, May 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Namibia’s next multi-mineral growth province

    Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    Midas Minerals prepares to transition copper assets to full scale drilling

    Midas sells Australian project to invest in Otavi Copper-Gold Project

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    Kavango West-1X

    ReconAfrica secures permits for Kavango West oil flow testing in Namibia

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas Minerals hits 46.2m at 4.01% copper equivalent at Otavi’s T-13 deposit

    Midas plans more drill rigs at Otavi copper-silver-gold project

    Midas plans more drill rigs at Otavi copper-silver-gold project

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Cleanergy plans 12.7km green-ammonia pipeline to Walvis Bay

by Editor
August 18, 2025
in Magazine
0
Cleanergy plans 12.7km green-ammonia pipeline to Walvis Bay
521
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Cleanergy Solutions Namibia (Pty) Ltd is proposing a 12.7-kilometre ammonia pipeline linking its planned green-ammonia production plant on Farm 58, near Dune 7, to the ammonia terminal in the Port of Walvis Bay.

The carbon-steel line would move about 800 metric tons of green ammonia per day from the plant to port-side storage for export.

According to the project description, the route lies within the Erongo Region and has been mapped to connect the inland plant directly to existing port infrastructure.

The corridor selection is intended to minimise surface disturbance while ensuring a reliable and continuous transfer of product to the terminal.

Cleanergy, a joint venture between the Ohlthaver & List (O&L) Group and CMB.TECH positions the pipeline as a critical link in Namibia’s emerging green fuel value chain. O&L, Namibia’s largest privately held group, holds 51% of the venture, while CMB, based in Belgium. TECH, which focuses on hydrogen and ammonia applications in maritime and heavy industry, holds the remaining 49%. Cleanergy also has a 25-year lease agreement with the Walvis Bay Municipality for the Farm 58 site.

The total capital commitment for the broader project—including the ammonia pipeline, production facility, hydrogen demonstration site, and ammonia terminal—is estimated at N$50 billion, with backing from Belgian partners and additional funding streams tied to Namibia’s green hydrogen programme.

Construction and operations

During construction, the developer envisages “low-impact and non-intrusive” activities focused on installing the carbon-steel pipeline and associated infrastructure. Detailed methods, construction windows, and traffic management will be set out in the environmental documentation and the project’s Environmental Management Plan (EMP). Once commissioned, the line would operate continuously, transporting 800 tonnes per day of green ammonia from Farm 58 to the port terminal for storage and shipment.

The ammonia terminal itself, budgeted at approximately €230 million, is expected to be ready between 2026 and 2028.

Meanwhile, a hydrogen demonstration plant with a refuelling station and Hydrogen Academy is scheduled to begin operations in late 2024.

Desert corridor notes (added without changing the text above)

The project is situated within the Erongo coastal desert near Dune 7, and the described route selection—“to minimise surface disturbance”—reflects this context.

The stated “low-impact and non-intrusive” construction approach, along with the use of defined construction windows and traffic management, will be detailed in the EMP to guide the work in the desert setting.

Because the pipeline links a single inland plant directly to port storage, normal operations in the desert corridor after commissioning are limited to the closed-pipe transfer of about 800 t/day and routine monitoring, concentrating most day-to-day activity at the plant and the terminal rather than along the desert route.

With the demonstration plant expected in 2024, the ammonia terminal between 2026 and 2028, and full-scale operations aligning with Namibia’s target of producing over 700,000 tonnes of renewable ammonia annually by 2030, the pipeline is positioned as an essential early element in the country’s green fuel ambitions.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana raises US$11.5m for Namibia offshore drilling campaign

Sintana raises US$11.5m for Namibia offshore drilling campaign

May 25, 2026
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

May 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In