• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, July 16, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    ReconAfrica penetrates 400m hydrocarbon interval at Kavango West 1X

    ReconAfrica records first onshore hydrocarbon flow during Namibia production test

    Pancontinental sees over 20 billion barrels recoverable at PEL 87

    Pancontinental launches feasibility study to improve PEL 87 seismic data processing

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    South32 backs expanded copper hunt across Noronex’s Namibian projects

    Elevate now owns 90% stake in Marenica uranium project

    Elevate now owns 90% stake in Marenica uranium project

    Golden Deeps uncovers bonanza-grade copper and silver beneath Graceland gossans near Tsumeb

    Golden Deeps to test three-deep sulphide targets at Graceland prospect in Otavi

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    Noronex plans 2,500m Namibia copper drill programme for 2026/27

    Connected Minerals seeks A$4.5m to accelerate Namibia uranium exploration

    Connected Minerals seeks A$4.5m to accelerate Namibia uranium exploration

    Former Namcor executive Nakashole now Galp deputy country manager for public and ops affairs

    Former Namcor executive Nakashole now Galp deputy country manager for public and ops affairs

    Midas Minerals to start drilling Otavi Copper Project after acquisition clearance

    Midas brings 7th rig as resource upgrade takes shape at T-13 in Otavi

    Former Eldorado Gold Corporation general manager Francisco Ballesteros takes the helm at Rosh Pinah Zinc

    Former Eldorado Gold Corporation general manager Francisco Ballesteros takes the helm at Rosh Pinah Zinc

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Husab’s N$8.8b turnover anchors Namibia’s uranium ambitions

by Editor
August 10, 2025
in Magazine
0
Husab’s N$8.8b turnover anchors Namibia’s uranium ambitions
556
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Husab Mine, the world’s largest open-pit uranium operation and the third-largest uranium producer globally, posted an annual turnover of N$8.8 billion in its latest reporting year.

This is according to the Swakop Uranium Executive Vice President Irvinne Simataa’s presentation during the just-ended mining expo in Windhpek.

The figure, based on hedged prices shaped by a decade of subdued uranium markets, marks a milestone for a project that has consumed US$5 billion in acquisition and development and is now operating at predictable levels of output, safety, and revenue.

Husab Swakop Uranium (Pty) Ltd is 90 per cent owned by China General Nuclear (CGN) and 10 per cent by Namibia’s Epangelo Mining.

The project was acquired for more than US$2 billion from Extract Resources in 2012, at a time when the uranium sector faced uncertainty following the 2008 global financial crisis and the 2011 Fukushima disaster.

CGN’s core business is nuclear power generation. Domestically, it produces 54 per cent of China’s nuclear power through 28 reactors generating 33 gigawatts, and it has 16 more under construction with a planned output of 20 gigawatts.

Epangelo’s participation reflects uranium’s classification as a strategic mineral in Namibia.

Husab employs 4,300 people, representing 22 per cent of Namibia’s total mining workforce.

This includes 1,700 permanent employees, 96 per cent of whom are Namibian.

The mine contracts for a further 2,600 workers, with expatriates accounting for just 4 per cent of the total workforce.

Of these, 3 per cent are Chinese secondees, and 1 per cent come from SADC countries.

Fixed-term contracts are primarily used in management positions for performance accountability.

The operation moves 120 million tonnes of material annually, more than triple the output of Namibia’s next largest mine.

Uranium production stands at 5,300 tonnes of U₃O₈ per year against a design capacity of 6,000 tonnes, making Husab the largest open-pit uranium producer in the world.

Life of mine currently extends to 2044, based on a resource of 315,000 tonnes, with significant expansion potential from ongoing exploration.

Utilities requirements are extensive. Husab consumes nine million cubic metres of water annually, accounting for 65 per cent of the Erongo Region’s total demand, and draws 50 megawatts from the national grid.

This is supplemented by a 12-megawatt solar plant, a 15-megawatt steam turbine powered by sulfuric acid plant off-gases, and a 10-megawatt emergency backup load.

Husab holds NOSA 5-star safety certification and is certified to ISO 9001, 14001, 45001, and 37001 standards. Since a fatality in 2018, the mine has maintained a strong safety record, narrowly losing the top safety award to Debmarine Namibia in the past two years.

Mining began in 2014, with the first drum of uranium produced in December 2016. Between 2016 and 2019, production remained stagnant at around 4,000 tonnes annually, hindered by mining inefficiencies.

The original mega-fleet, comprising Komatsu 960 trucks and Caterpillar 7495 electric hydraulic shovels, was optimised for massive ore bodies, but Husab’s complex, deep deposits required more selective mining.

A revised mining strategy deployed the large fleet for waste stripping while two contractors with smaller fleets handled ore mining.

This increase in mining volumes by 40 per cent in 2021 and another 25 per cent in 2024 enabled the plant to process 12 million tonnes annually.

Bottlenecks shifted from mining to processing, and plant performance now supports predictable output.

Husab spends approximately N$10 billion annually on procurement, with 70 per cent of the sourcing being local.

Of this, over N$2 billion is paid to government-owned entities and N$5 billion to local private suppliers. Namcor supplies 69 million litres of diesel annually, worth N$1.3 billion, while NamWater’s invoices are equivalent to Windhoek’s entire water consumption.

The mine’s power and water invoices place it among the largest utility clients in Namibia.

The mine contracts with 57 on-site service providers, employing 2,600 people, and works with over 400 suppliers.

The largest spend categories are mining services, mining maintenance, and consumables. Some procurement classified as local involves Namibian-registered companies representing foreign original equipment manufacturers due to intellectual property and technical capacity constraints.

In tax contributions, Husab consistently pays substantial amounts in PAYE and withholding tax, earning recognition from the Namibia Revenue Agency for compliance.

It has been the most significant single company contributor to PAYE. However, corporate tax payments remain minimal due to accumulated assessed losses exceeding US$400 million from years of operating in a low uranium price environment.

Management maintains that the mine will pay corporate taxes once these losses have been offset and stresses that surviving the first decade required carrying these losses while keeping the operation alive.

Husab’s foundation focuses on livelihoods, health, and education.

It has pledged 10,000 goats and sheep to seven Erongo constituencies to restock resettled farms. It provided oxygen and equipment during the COVID-19 pandemic, continues to train healthcare workers, and invests in school facilities and skills development initiatives.

Husab has launched Namibia’s most extensive exploration campaign, spanning 680,000 metres over seven years.

Drilling began in 2024 with 54,000 metres, and 100,000 metres are planned for 2025. The aim is to discover another “Husab within Husab.”

A N$450 million industrial-scale heap leach pilot plant, operational since July 2024, is processing low-grade ore. A commercial decision is expected in the second quarter of 2026, potentially boosting output above 6,000 tonnes per year.

In partnership with NamWater, Husab will contribute N$170 million to build Erongo’s second desalination facility, securing water for itself, other mines, and surrounding communities.

The exploration and heap leach projects have already created 182 additional jobs. Further employment is expected during construction and operation.

In 2025, Husab was ranked first in business performance among CGN’s 56 companies worldwide and won the group’s award for best business management. Management credits the turnaround to a deliberate focus on attracting and retaining top talent, building robust systems, and delivering on commitments to shareholders.

If current performance continues, Husab projects that by 2028 it could become Namibia’s first billion-US-dollar turnover business, reinforcing its position as a cornerstone of the country’s extractive economy and a key player in the global uranium market.

Share222Tweet139
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
ReconAfrica penetrates 400m hydrocarbon interval at Kavango West 1X

ReconAfrica records first onshore hydrocarbon flow during Namibia production test

July 16, 2026
Kaoko confirms high-grade copper and tungsten at Karibib

Kaoko confirms high-grade copper and tungsten at Karibib

July 16, 2026
Wia Gold offloads Côte d’Ivoire permits to focus on Kokoseb

Wia prepares to publish Kokoseb underground resource in Q3 2026

July 16, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In