• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, September 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Prospect receives two offers for the A$2.383m Omaruru lithium project

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Tower Resources expands loan to fund Cameroon drilling and Namibia farm-out

by Editor
July 1, 2025
in Oil & Gas
0
Tower Resources expands loan to fund Cameroon drilling and Namibia farm-out
527
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Tower Resources is reinforcing its ability to deliver on key projects in Africa by expanding its bridge loan facility to £750,000.

This move is designed to maintain momentum on two fronts: the planned drilling of the NJOM-3 well in Cameroon and the ongoing farm-out negotiations for its Namibian offshore blocks.

In Cameroon, the company is preparing for the arrival of the Admarine 510 rig, scheduled for October 2025.

The additional funding will allow Tower to secure critical services and long-lead equipment necessary to ensure the NJOM-3 well is drilled on time.

This well is a central part of the Thali license development strategy and is expected to unlock significant reserves and value for the company.

At the same time, Tower’s Namibian operations are set to benefit from the increased financial flexibility.

The company is actively negotiating a farm-out deal for its deepwater Namibian acreage, aiming to bring in a partner to share exploration costs and mitigate project risk.

The expanded loan ensures Tower can keep these negotiations moving forward without delay and continue planning work to support a future drilling campaign.

Tower Resources’ Chairman and CEO Jeremy Asher has emphasised the importance of securing funding to maintain operational momentum in both countries.

By expanding the bridge loan, the company aims to stay on track with its strategy of delivering high-impact wells while minimising shareholder dilution through timely farm-out agreements.

The loan itself runs for up to 12 months from 25 March 2025. It is unsecured, though backed by corporate guarantees from Tower’s operational subsidiaries. Interest accrues at an annual rate of 15% and is paid at maturity, with a 5% fee charged at the time of drawdown.

The loan features a fixed conversion price of 0.05588 pence per share, set at a 100% premium to the average market price at the time of the original issue, giving Tower the option to prepay the loan with accrued interest if its share price remains below the conversion threshold.

By securing this expanded facility, Tower Resources ensures it can meet the near-term needs of its Cameroon drilling program while continuing to advance its plans in Namibia, thereby strengthening its position as an exploration-led company focused on delivering value across Africa.

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

BoN Symposium: Oil and gas draws N$74.4bn in foreign investment – Haiyambo

September 25, 2026
BoN Symposium: Namibia warned against oil contracts that limit future law changes

BoN Symposium: Namibia warned against oil contracts that limit future law changes

September 25, 2026
Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

CNOL completes US$320m Etango strategic financing deal

September 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In