• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, May 13, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Paladin’s Namibian momentum draws UBS endorsement

    Langer Heinrich swings to US$18m profit as uranium sales top US$209m

    Meren Energy says TotalEnergies has submitted Venus field development plan

    Meren Energy says TotalEnergies has submitted Venus field development plan

    Oregen hires Venus architect as it targets Namibia’s Orange Basin

    Oregen hires Venus architect as it targets Namibia’s Orange Basin

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy trims US$15m funding burden, locks in 20% in PEL 93

    Okanjande graphite to be upgraded into Battery Anode Material in a N$3b facility in France

    Northern Graphite begins relocating plant for Okanjande restart late 2027

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Kaoko Metals lists with $6.5m raise, targets high-grade Chalkos Copper-Silver Project

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    Shaanika takes over as Chamber CEO as Malango retires after 20 years

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    General Copper targets 80% stake in Otjozondjupa 48,500ha licence

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Andrada expands Lithium Ridge drilling after 21m at 1.24% Li₂O and near-surface hits

    Mining exports hit N$64.7bn as Namibia shifts focus to energy, oil and gas — Nandi-Ndaitwah

    Namibia says 51% free-carry mine ownership not policy

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Can Horizon finally get it right with Kombat’s battle with water?

by Editor
July 1, 2025
in Magazine
0
Can Horizon finally get it right with Kombat’s battle with water?
560
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Deep in Namibia’s Otavi Mountainland lies Kombat Mine—one of the country’s oldest and most stubbornly challenging mining operations.

In May 2025, Trigon Metals agreed to sell its entire interest in Namibia’s Kombat Mine to Horizon Corporation for US$24 million (about N$429–444 million), paid in instalments.

The deal includes production bonuses, a copper royalty, and loan forgiveness.

Horizon Corporation aims to restart and stabilise operations, bringing new investment and potential jobs to the historic copper site.

Horizon Corporation operates globally with gold production in Mozambique, copper-gold-silver projects in Utah, and copper-cobalt tailings reprocessing in Zambia, showcasing a diversified portfolio and expertise in developing strategic metals for sustainable, long-term returns.

For over a century, Kombat has drawn miners with its rich copper veins and promise of prosperity. However, it has also defeated many with its relentless flooding of underground water.

Kombat’s history dates back to around 1900 when German prospectors first developed shafts into the region’s copper-rich dolomites. By the 1950s and 60s, Kombat was one of Namibia’s flagship copper producers under Tsumeb Corporation Ltd. At its peak, the mine produced around 12,000 tonnes of copper concentrate per year, feeding Namibia’s smelters and global markets alike.

Employment boomed during these decades. Hundreds of miners, engineers, mechanics, and support workers found steady jobs. Kombat town itself was built to house them, with shops, schools, clinics—an entire local economy running on copper.

But even in those golden years, water was a constant adversary. Pumps ran continuously to prevent groundwater from seeping through the fractured dolomite. Without them, the mine would drown.

By the late 1980s and 1990s, global copper prices had fallen. Maintenance slipped. Tsumeb Corporation itself changed hands, eventually winding down operations. Kombat’s ownership shifted multiple times from Tsumeb Corp. to Ongopolo Mining and Processing, which attempted to revive operations in the early 2000s.

Weatherly International, a UK-listed junior miner that reopened Kombat briefly in the mid-2000s.

Weatherly’s plan aimed to deliver over 7,000 tonnes of copper annually. At restart, it created over 400 direct jobs, as well as numerous additional positions in local supply and services.

But the familiar problem remained. Dewatering costs were high. Pumps failed during shutdowns. When copper prices dipped, Weatherly mothballed Kombat. Hundreds of workers were retrenched. Kombat town fell quiet.

By the 2010s, with the pumps switched off, Kombat’s underground workings filled with water. Shafts, stopes, and tunnels disappeared below the water table. Equipment rusted, and walls collapsed.

For local families, it was a crushing blow. Businesses closed. Young people left for Otavi or Windhoek. Kombat became a mining ghost town—its once-proud legacy was lost underwater.

In 2017, Canada’s Trigon Metals acquired Kombat Mine, offering new hope. High copper prices returned, driven by the green energy boom and electrification. Trigon mapped out ambitious plans: dewater the mine, refurbish the plant, rehire workers, and restart production to produce 4,000–6,000 tonnes of copper concentrate annually.

At its height in 2021–22, Trigon’s restart employed over 200 people directly. Contractors and local suppliers ramped up. Kombat’s economy flickered back to life.

But water again proved its dominance. Dewatering costs soared. Pumps required constant maintenance. Rainy seasons flooded lower levels faster than expected. Investors grew cautious as Trigon’s reports admitted delays and cost overruns.

Despite partial plant commissioning, full-scale underground mining never reached consistent production. By late 2023, Trigon was under severe financial strain.

In 2024, Trigon sold Kombat Mine to Horizon Namibia Mining (Pty) Ltd, marking another chapter in the mine’s turbulent history. The sale was framed as a way to ensure Kombat’s long-term future under local control, with Horizon committed to tackling the water problem head-on.

For Kombat Town, the deal brought cautious optimism. Horizon promised local job creation and committed to continuing the dewatering effort to make the mine safe and workable again. But the community remembers the pattern: every shutdown means hundreds of lost jobs. Every restart brings hope, often short-lived if water overwhelms the pumps.

Geologically, Kombat’s issue is clear. The Otavi dolomites are natural aquifers. Any shaft or tunnel cuts into these water-bearing layers. The mine cannot ever be “dry” in the true sense. Instead, it demands continuous pumping—24 hours a day, forever.

Stop the pumps for even a week, and levels will rise rapidly. Flooded sections take months and millions to reclaim.

In addition to volume, water chemistry poses challenges: dissolved minerals cause scale, corrosion, and environmental compliance issues. Any discharge must meet Namibian ecological standards to protect local water sources and ensure the preservation of the environment.

Horizon has reportedly begun upgrading pumping systems, investing in treatment facilities, and hiring maintenance teams. Yet every move carries costs that copper sales must offset.

At its peak, from the 1950s to the 1970s, Kombat Mine employed over 600 people directly, with additional informal contract workers supporting operations.

During the 2000s, Ongopolo and Weatherly’s restart efforts created approximately 300 to 400 jobs, including those of contractors, before the facility shut down again.

More recently, Trigon’s 2021 to 2023 push generated roughly 200 positions, combining direct hires and contract roles; however, many of these were lost once the plans slowed.

These figures do not include workers from contract companies.

Each new ownership wave hires and trains workers. Each failure sees those livelihoods vanish. The town’s future has become a mirror of the mine’s pumps: when they work, so does Kombat. When they fail, everything floods—literally and economically.

Horizon now owns both the promise and the curse of Kombat Mine. The copper remains underground, as valuable as ever in a decarbonising world hungry for electrical infrastructure. The community is ready to work.

But will Horizon finally solve the mine’s oldest problem? Can they keep the water at bay, maintain steady production, and deliver jobs and revenue sustainably? Or will Kombat once again prove that in this corner of Namibia, the hardest thing to mine isn’t copper—it’s hope itself?

Share224Tweet140
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Paladin’s Namibian momentum draws UBS endorsement

Langer Heinrich swings to US$18m profit as uranium sales top US$209m

May 13, 2026
Meren Energy says TotalEnergies has submitted Venus field development plan

Meren Energy says TotalEnergies has submitted Venus field development plan

May 13, 2026
Rosh Pinah commissions recycling water treatment plant  

Rosh Pinah commissions recycling water treatment plant  

May 12, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In