• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, November 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • PIPELINES
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    50 cyclists to race through Otjihase copper mine’s underground tunnels

    50 cyclists to race through Otjihase copper mine’s underground tunnels

    BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    ReconAfrica in talks to terminate NAMCOR stake acquisition

    Celsius Resources progresses Opuwo Cobalt Project disposal plans

    Bank of Namibia grants conditional approval for US$15m Opuwo cobalt project sale

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Kaoko Metals strikes copper-silver mineralisation at two prospects 2.2km apart

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Giyani secures US$2.5m for K.Hill manganese project in Botswana

    Namibia mining output falls 17% as Chamber warns of further contraction

    Namibia mining output falls 17% as Chamber warns of further contraction

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Huaye recruits 40 workers for Khoemacau expansion in Botswana

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Skeleton Coast Uranium raises C$3.56m for Namibia exploration

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Sweet Thorn Pan puts Serval’s Botswana copper ambitions to the test

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Star Minerals walks out of uranium project deal with Critical One Energy

by Editor
March 12, 2025
in Uranium
0
Star Minerals walks out of uranium project deal with Critical One Energy
543
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Critical One Energy (formerly Madison Metals) and Star Minerals have cancelled their earn-in and joint venture agreement over the Cobra Uranium Project in the Erongo Region.
Pennywort Investments, in which Madison holds an 85% shareholding interest, has the Cobra Project EPL 8531, which expires on October 17, 2025, and can be extended as per the tenement conditions for a further two-year period.
The agreement, first announced on September 19, 2024, would have seen Star Metals acquire up to 51% of EPL 8531 after spending US$3.95 million over three years, including progress payments.
Critical One Energy says Star Minerals did not meet its commitment after it requested in December 2024 an extension of the closing to early March 2025.
As a result, Critical One Energy says it continues to hold an 85% interest in the Cobra Uranium Project and a US$40,000 non-refundable deposit, a US$75,000 payment, and 5.3 million common shares of Star Minerals.
Star Minerals says they disagreed on terms on any revised terms of acquisition and extension of the remaining first payment of US$225,000, due on or before 8 March 2025.
Cobra Project’s foreign estimate of quantity and grade of mineralisation is 15.6 Mt at 260 ppm U3O8 for 9Mlb U3O8.
The foreign mineralisation estimates are taken from a November 2015 report completed by SRK Consulting (UK) Limited.
The Cobra Project permit holder used categories of mineralisation equivalent to mineral resources by the JORC Code 2012.
The resource report was not released publicly and did not include the measured and indicated estimates.
Star Minerals only received the drilling data, including the quality assurance and quality control, and not the resource estimation data.
A Namibian private company, Cobra Resources, held the tenements EPL 3524 and 3624 and completed most fieldwork in 2015.
The uranium mineralisation intersected in selected areas, and drilling was based primarily on reverse circulation drill holes drilled between January and July of 2015.
The current mineralisation database for Areas 1 and 3 of the Cobra Project consists of over 3,720 metres of reverse circulation drilling from 50 drill holes.
Cobra Resources engaged SRK in 2015, which derived an estimate of 15.6 Mt grading at 260 ppm U3O8 for a contained metal total of 9.0 Mlbs U3O8.
Most of this tonnage is within the Area 3 deposit, which also has a higher U3O8 grade than Area 1.
Area 3 comprises 14.65 Mt of inferred material at 270 ppm U3O8 for a contained metal total of 8.6Mlbs U3O8.
The smaller Area 1 deposit includes 0.96 Mt of inferred material at 200 U3O8 for a contained metal total of 0.4Mlbs U3O8.
Madison Metals acquired an 85% share in the project in 2022 and completed two areas of surface radiometric over and along Areas 1 and 3.
Madison further drilled targets along the strike from Area 3, referring to it as the Madison North target.

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
Namibia’s next multi-mineral growth province

Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

May 25, 2026
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
50 cyclists to race through Otjihase copper mine’s underground tunnels

50 cyclists to race through Otjihase copper mine’s underground tunnels

November 26, 2026

BW Energy begins monthly PEL 73 funding after exhausting C$22m investment

November 26, 2026
ReconAfrica in talks to terminate NAMCOR stake acquisition

ReconAfrica in talks to terminate NAMCOR stake acquisition

November 26, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe