• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Khan project a game-changer in the uranium industry – Parnham

by Editor
January 3, 2025
in Uranium
0
Madison Metals to raise N$48.3m for Khan Uranium Project drilling activities
568
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Critical One Energy (formerly Madison Metals Inc.) says the latest initial metallurgical test work results at its Khan Uranium Project at Madison West demonstrate excellent uranium recovery rates and low acid consumption.
In a report this week, Critical One Energy said the initial test work achieved recovery rates ranging from 71.1% to 86.6%, indicating strong extractability.
Acid consumption was measured at a maximum of 14.2 kg/t, significantly below regional benchmarks like the Husab Mine, which averages 34 kg/t.
Low niobium (Nb) and tantalum (Ta) suggest limited betafite, enhancing processing simplicity.
As at other significant uranium deposits in the region, such as Rössing, Husab, and Valencia, uranium at Critical One’s Khan Project is hosted mainly in D-type leucogranites with limited mineralisation at the contact zones with the country rocks.
Critical One Energy conducted bottle roll leach tests from three reverse circulation samples collected during the August 2024 drilling campaign.
The main aim of the test work was to obtain an indication of acid consumption to be expected (acid consumption index, or ACI) and ascertain U₃O₈ recovery.
Uranium extraction achieved ranges from 71.1% to 86.6%. Acid consumption is low at a maximum of 14.2 kg/t, much lower than the Husab Mine at 34 kg/t.
Although preliminary and limited in scope, the results are promising and have provided further confidence in Critical One’s Khan Uranium Project.
Additionally, the samples were analyzed for Nb and Ta, which are minor elements in betafite—a refractory uranium-bearing mineral found in Rössing ore.
At Rössing, betafite typically can constitute 4% of the ore.
The low Nb value and undetected Ta indicate the potential for low betafite in the Khan leucogranites.
Critical One Energy CEO Duane Parnham said these results firmly position the Khan project as a game-changer in the uranium industry.
Parnham said Critical One Energy is advancing toward redefining what’s possible in uranium production with exceptional recovery rates and unparalleled cost efficiency.
Bernard Sililo assessed the results.
Sililo brings over 20 years of expertise in uranium metallurgy, having served as a metallurgist at Rössing Uranium and currently as a lecturer at the Namibia University of Science and Technology.

Share227Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In