• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 7, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Gratomic goes back to drawing board for Aukam

by Editor
November 22, 2024
in News
0
Singapore-based company, Tristream Capital, intends to invest N$70,5m in acquiring 5% of Aukam graphite mine’s gross sales royalty
544
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Gratomic is strategically repositioning to increase its focus on mining operations at the Aukam graphite mine and accelerate production.
The Canadian company had planned production of 12,000 tons by November 2024.
In a recent statement, Gratomic says no preliminary economic analysis, preliminary feasibility study, or feasibility study has been completed to support any production level.
It further stated that no mineral resources, let alone mineral reserves demonstrating economic viability and technical feasibility, have been delineated for the Aukam property.
However, Gratomic says it is working towards completing a study on scaling up the existing Aukam Processing Plant to a commercial-size facility capable of producing the desired concentrate grades and production rates.
The study’s recommendations and subsequent implementation will provide conclusions and recommendations at a feasibility study level of comfort.
Additionally, Gratomic says the supply of graphite is conditional on its ability to bring the Aukam project into a production phase and for any graphite being produced to meet specific technical and mineralisation requirements. “Gratomic continues to move its business towards production. As part of its business plan, it expects to file a National Instrument 43-101 Standards of Disclosure for Mineral Projects resource estimate in Q4 2025,” the company says.
Tristream Capital announced plans in June 2024 to inject £3 million (US$3.8 million) into the Aukam graphite project in exchange for a 5% royalty on graphite sales.
The companies signed a non-binding letter of intent on June 17, 2024, and a definitive agreement was expected to be signed within three months after Tristream had conducted due diligence.
Gratomic says the finalisation of the agreement will be done once an independent engineering firm releases the engineering report from Australia.
Gratomic CEO Arno Brand says it has been a challenging environment for graphite companies in the market.
Brand says seeing graphite pricing rebalancing and market sentiment strengthening is a relief. “These factors should yield positive results in completing the necessary steps to deliver our endeavours successfully,” Brand says.
Gratomic is also outsourcing all marketing of its product to an independent trading firm, while a house in Windhoek will be sold on November 30 for about C$712,000 net of commissions and taxes.
The sale proceeds will be put towards advancing and sustaining Namibian operations.
Meanwhile, Gratomic executive chair Bruno Baillavoine has left the company for personal reasons.
Gratomic says Baillavoine’s position will remain vacant, and the remainder of the board will absorb his duties as the company assesses the best candidate to fill the position later.

Share218Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe