• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Namibia’s next multi-mineral growth province

    Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    Midas Minerals prepares to transition copper assets to full scale drilling

    Midas sells Australian project to invest in Otavi Copper-Gold Project

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    Kavango West-1X

    ReconAfrica secures permits for Kavango West oil flow testing in Namibia

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas Minerals hits 46.2m at 4.01% copper equivalent at Otavi’s T-13 deposit

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

by Editor
June 6, 2025
in News
0
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31
519
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining reports that it processed 254,745 tonnes of tin, representing a 7% year-over-year increase and a 4% quarter-over-quarter increase during the period ended May 31, 2025.
The plant enhancements implemented under the Continuous Improvement 2 programme, notably the modifications to the Dense Media Separation circuit and the installation of new shaking tables, drove the improvement.
Processing throughput rose to an average of 142 tonnes per hour for the quarter, reflecting gains in operational efficiency attributed to the CI2 initiatives.
The average feedstock grade was 0.136% tin, which is 4% lower year-over-year, primarily due to the use of blended ore.
The grade, however, showed a 2% improvement over Q4 FY2025. Despite the slightly lower grade year-over-year, the increased ore throughput contributed to an 11% year-over-year and 7% quarter-over-quarter increase in tin concentrate production, reaching 405 tonnes for the quarter.
As a result, contained tin production increased to 238 tonnes.
The plant’s utilisation rate improved, mainly due to reduced maintenance-related downtime and further efficiency gains achieved through the CI2 programme.
The work plan and budget for the Stage 1 development of Lithium Ridge have been finalised, triggering the drawdown of the US$7 million funding facility to support extensive exploration and drilling activities.
The company began exploring Lithium Ridge in May, following the earn-in agreement with Sociedad Química y Minera de Chile SA through its subsidiary, SQM Australia (Pty) Ltd.
Tantalum operations delivered a notable improvement in performance during the quarter, driven by a higher feed grade and the reprocessing of off-specification material. As a result, approximately 12 tonnes of concentrate with 1.4 tonnes of contained tantalum were produced.
Of this, 10 tonnes of concentrate were shipped to Afrimet during the period, reflecting ongoing offtake execution and consistent production delivery.
Andrada Mining CEO Anthony Viljoen says the company continues to demonstrate strong operational momentum and strategic progress across all areas of the business, reinforcing its role as a key enabler in the development of Namibia’s critical minerals sector.
Viljoen says these modifications resulted in increased processing rates and tin production, underscoring the growing efficiency and reliability of our operations.
“The output of our increasingly valuable byproduct, tantalum, improved notably, reinforcing our multi-mineral offering.
“Operational cost performance improved overall, driven by ongoing proactive cost-reduction initiatives that are expected to enhance cashflows over the year,” Viljoen says.
Viljoen says this includes the completion of a group-wide corporate restructuring, which is expected to rationalise the cost base further and strengthen overall profitability.
‘Construction of the new jig plant is progressing well, with the front-end crushing circuit having been delivered to Uis and the fabrication of key components underway,” Viljoen says.
He says Andrada Mining remains focused on operational excellence, disciplined capital deployment, and the strategic development of our diversified portfolio of critical minerals.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Northern Graphite plans restarting Okanjande in 2027

Okanjande plant relocation 60% complete as Northern targets 2027 mine restart

June 2, 2026
African Pioneer eyes 2026 mine decision as Ongombo drilling nears

African Pioneer eyes 2026 mine decision as Ongombo drilling nears

June 2, 2026
Forsys targets 20,000-t uranium bulk sample at Norasa

Forsys targets 20,000-t uranium bulk sample at Norasa

June 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In