• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, August 18, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx nears end of Haib infill drilling as resource update looms

    John Borshoff leaves behind a US$6b legacy in Namibia and Malawi

    Forsys becomes Asarian Energy, targets uranium expansion beyond Namibia

    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Elevate Uranium plans U-pgrade™ demo plant for mid-2025

by Editor
October 30, 2024
in News
0
Elevate Uranium to upgrade Koppies inferred resource to indicated category in 2025
515
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium intends to use the US$25 million raised on October 22, 2024, to fund the Koppies Uranium Project and its U-pgrade™ uranium ore beneficiation process.

The company says the results from the ongoing metallurgical testwork program at the Koppies uranium project using the U-pgrade™ will inform the design of a demonstration plant planned to operate by mid-2025.

The U-pgrade™ is potentially an industry-leading and economically transformational beneficiation process for upgrading surficial uranium.

This breakthrough process was developed on ore from Elevate Uranium’s Marenica Uranium Project, and subsequently, testwork has been undertaken on ore samples from several other uranium resources.

Elevate Uranium has demonstrated, in bench scale testwork, that the U-pgrade™ beneficiation process concentrates the uranium by a factor of 50 and increases Marenica Project ore grade from 93 ppm to ~5,000 ppm U3O8.

U-pgrade™ also rejects ~98% of the mass before leaching, producing a high-grade concentrate in a low mass of ~2% (leach feed). In addition, U-pgrade™ rejects acid consumers, potentially reducing operating costs by ~50% and capital costs by ~50% compared to conventional processing.

Elevate Uranium has determined, through bench-scale testing, that calcrete-hosted uranium deposits in Namibia and Australia are among those that are amenable to the U-pgrade™ process.

Additionally, Elevates Uranium wants to use the funds to complete a Koppies Uranium Project Scoping Study or a higher-level study and to drill about 100,000 metres of resource and exploration across its Namibian and Australian tenement portfolio.

 

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

Skeleton Coast identifies first uranium targets across three Erongo licences

August 18, 2026
Bannerman targets over 80% Namibian workforce at Etango

Bannerman targets over 80% Namibian workforce at Etango

August 18, 2026
ReconAfrica moves Kavango West discovery towards appraisal well

ReconAfrica moves Kavango West discovery towards appraisal well

August 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In