• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate Uranium’s Namibian projects mineral resource increases to 112.1Mlb

by Editor
October 9, 2024
in Uranium
0
Elevate Uranium’s Namibian projects mineral resource increases to 112.1Mlb
587
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium’s Namibian mineral resource has increased to 112.1 Mlb U3O8, while the company’s global mineral resource has risen to 160.5 Mlb U3O8.
The company has upgraded its Koppies Deposit JORC mineral resource estimate from inferred to indicated status, with 78% of the resource now in the indicated category.
Elevate Uranium has also announced a 10.2 Mlb U3O8 maiden mineral resource estimate at the Hirabeb deposit, located south of the Koppies resource.
The mineral resource estimates at the Koppies and Hirabeb deposits increase the total Koppies Uranium Project resource to 66.1 Mlb U3O8 and the Namibian total to 112.1 Mlb U3O8.
Koppies is one of the shallowest uranium resources globally, with approximately 95% of the total mineral resource within 18.5 meters and 50% within seven meters of the surface.
Elevate Uranium says these parameters imply a potential low strip ratio and low-cost mining operation at Koppies, which would benefit the overall economics of any future operation.
The Hirabeb deposit has a mineralisation style and resource depth similar to the Koppies Resource.
Elevate Uranium’s managing director, Murray Hill, said the Koppies Uranium Project continues to mature, with 78% of the Koppies Resource upgraded to the JORC-indicated category.
Hill said the total Koppies Project mineral resource is now 66 Mlb U3O.
“We have also estimated a maiden resource at the nearby Hirabeb deposit, which added another 10.2 Mlb U3O8 to the Koppies project. “The success at Hirabeb highlights the project area’s potential as we continue to explore the ground and target further expansion of the resource base,” Hill said.
According to Hill, the company continues substantial exploration drilling programs at Hirabeb and several other projects.
He added that they could encounter previously unidentified mineralisation in areas where historical exploration has occurred after gaining geological knowledge at Koppies that uranium mineralisation extends into a weathered basement adjacent to the paleochannels.
“This knowledge drives us to explore the likelihood of identifying additional uranium mineralisation,” Hill said.

 

Share235Tweet147
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In