• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, August 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Namibia gives Pancontinental one year to prove PEL 87

    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Midas targets three copper resources within six months

    Midas targets three copper resources within six months

    Askari Metals to become Highland Metals in strategic rebrand

    Askari Metals to become Highland Metals in strategic rebrand

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada returns 14.72% Li₂O as Lithium Ridge expands to 9km

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Green Hydrogen

Most green hydrogen projects are in protected areas for wind & solar power – GH2N

by Editor
September 12, 2024
in Green Hydrogen
0
Most green hydrogen projects are in protected areas for wind & solar power – GH2N
537
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Namibia Green Hydrogen Program (GH2N) says most projects are in protected areas because of the wind quality.
GH2N explains that for the efficient production of green hydrogen, a constant green energy supply to the electrolyser is required, hence the combination of wind and solar energy.
Namibia has some of the best solar irradiation levels in the world, with over 3,000 hours of sunshine annually and significant wind capacity along its northern and southern coasts.
These abundant renewable resources are crucial for powering the electrolysis process to produce green hydrogen.
Namibia has high wind capacity potential along its northern and southern coast, with about 56 to 58% wind capacity factors.
Namibia’s consistent wind patterns provide an ample renewable energy source that can complement solar power.
Wind farms can be established to generate electricity that contributes to the hydrogen production process.
It says that the Namibian coast is covered by national parks, from the Tsau //Khaeb National Park in the south to the Namib Naukluft, Dorob, and Skeleton Coast National Parks.
According to GH2N, the coastal zone is the location of the natural resource required to produce green hydrogen at a competitive scale.
GH2N says the highest wind quality is found in the south of Luderitz.
The proposed Hyphen Energy project in the Tsau // Khaeb National Park is approximately 4,000 km².
The total size of the Tsau // Khaeb National Park is approximately 22,000 km².
The initial and early layout of the Hyphen green hydrogen project in the Tsau // Khaeb National Park covers 150 km².
This includes the solar farm, the wind turbines, the hydrogen production site, the pipelines for desalinated water, hydrogen and ammonia, access roads, power transmission lines and port complex infrastructure.
The size of the two land parcels allocated to Hyphen under the Feasibility Implementation Agreement (FIA) to perform the feasibility study is approximately 4,000 km².
Van der Linden says In the Tsau //Khaeb National Park, formerly known as the Sperrgebiet, diamond mining has been the predominant economic activity for over 100 years.
Currently, Namdeb is mining for diamonds in the coastal zone, and there is ongoing exploration of other minerals, including critical raw minerals and rare earth elements.
Besides green hydrogen, several renewable energy projects are establishing feasibility, including a 300MW wind energy park for NamPower, with one REE project already under construction (Diaz Wind Power Station). Should Kudu Gas reach a final investment decision, the gas pipeline to the Gas-to-Electricity plant will run from Elisabeth Bay in Tsau //Khaeb National Park to the planned industrial complex in Luderitz.
Tourism concessions have been granted in the Tsau //Khaeb National Park, and some more are under consideration.
In the Central Valley, the green hydrogen and related projects are located on private or conservancy land and not in the national parks.
The principal economic activity in the Namib Naukluft National Park is tourism, prospecting for and mining high-value, nationally essential minerals.
Tourism is the main economic activity in the Dorob National Park.
In the Northern Valley, there are currently no planned green hydrogen projects.
The principal economic activities in Skeleton Coast Park are tourism, prospecting, and mining.

Share215Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Namibia gives Pancontinental one year to prove PEL 87

August 1, 2026
Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

July 31, 2026
JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

July 31, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In