• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, June 29, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Arkle set to drill after confirming uranium across Erongo targets

    Arkle set to drill after confirming uranium across Erongo targets

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    Namibia approves Prime Global’s entry into Tower Resources’ offshore licence

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    South Korean Hanwha Ocean and SBM Offshore emerge as frontrunners for Venus oil development’s $10bn Venus FPSO

    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Haib copper project overall grade increases by 13-14% – Daun

by Editor
September 11, 2024
in Copper
0
I will look for new mining opportunities: Heye Daun
516
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The recently completed drill program at the Haib Copper Project has now been modelled, resulting in an overall grade increase of 13-14%.

The Haib project is a sizeable copper-molybdenum deposit located in the Karas region of southern Namibia, 30 km from the Orange River and the South African border.

The deposit is a porphyry copper-molybdenum dating from the Archean age.

The mineral resource is classified into indicated and inferred categories and is reported to have a cut-off grade of 0.25% copper (Cu).

The indicated mineral resource is 414 Mt @ 0.35% Cu for 3,216 Mlbs Cu at 0.25% cut-off, while the inferred mineral resource is 345 Mt @ 0.33% Cu for 2,503 Mlbs at 0.25% cut-off.

The Koryx Copper executive chairperson, Heye Daun, said this is a significant improvement achieved by focusing the drilling on structurally controlled, higher-grade portions.

Daun added that this success is even more remarkable, given the relatively limited amount of new drilling completed as part of this program.

“It is a testament to the quality of the technical work the team carried out and continues to identify further areas of potential grade improvement and mineral resource growth of the Haib deposit.
“As the incoming management team, we are very excited about the positive base that has been established.

“The next step is to build on this by planning and executing a significantly upsized follow-on drill program, initiating the additional met testwork to demonstrate the feasibility of a more conventional process route to generally continue to de-risk and fast-track the development of the Haib copper deposit,” Daun said.

Koryx Copper plans an additional significant drill program for later in 2024 or early 2025 to investigate areas of downdip extension with no previous drilling but the potential for substantial mineral resource expansion.

Drill rigs were mobilized to site during August, and a follow-on drill program is planned to start later in September 2024. Approximately 8,200 m of diamond core drilling in 36 holes has been planned to test potential resource extensions and to prove up additional mineralized material at hopefully higher grades.

A further drill program will then be planned to commence later in 2024 or early 2025, which will target the identified downdip extensions to mineralization where the RPEEE pit has been data constrained.

It is expected that a successful drill program in this area has the potential to significantly increase the total tonnage of the mineralised system.

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

Rössing records its strongest performance in 2025 when it produced 585 more tonnes of uranium

June 26, 2026
Aldoro secures funding and new drill rig for expanded Kameelburg program

Aldoro prepares for resource update after intersecting a record 542.9m at 1.38% TREO at Kameelburg

June 26, 2026
Arkle set to drill after confirming uranium across Erongo targets

Arkle set to drill after confirming uranium across Erongo targets

June 25, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In