• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, November 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

    Ministry’s amendments delay Tower’s farm-out deal

    Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

    Noronex, South32 plan 3,000m Kalahari copper drilling campaign

    Rosatom executive says Namibia approves uranium test-well drilling

    Rosatom executive says Namibia approves uranium test-well drilling

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    Chinese investors propose US$34.5m deal for Zhonghe mine idle since 2012

    BW engages 50 companies over Kudu gas project farm-down

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy finalises Namibian drilling tenders for uranium project

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Cobre completes 10 wells at Botswana copper project as Okavango drilling progresses

    Midas latest drill results confirm 800-metre copper-silver at Spaatzu discovery

    Midas deploys eight drilling rigs to define three Otavi copper resources

    Public review opens for Koppies West uranium project application

    Elevate cuts drilling to one rig as Marenica resource update nears

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Vantage Metals finds copper-silver mineralisation at Botswana’s Chanoga prospect

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada Mining achieves double-digit tin concentrate production in 2024

by Editor
August 30, 2024
in News
0
Andrada Mining achieves double-digit tin concentrate production in 2024
531
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining chairperson Glens Parsons says the company achieved a remarkable double-digit increase in tin concentrate production during FY 2024.
Parsons also says the company successfully produced its first commercial batch of tantalum, solidifying our position as a critical metal player.
In addition, he says Andrada Mining spent just over N$505 million (US$27 million) through procurement from Namibian suppliers in FY 2024.
According to Parsons, Andrada Mining achieved over 50% annual volume increases in tin concentrate and tin metal production.
He says this was mainly due to the plant expansion implemented towards the end of the prior financial year.
Furthermore, he says Andrada Mining successfully produced its first consignment of tantalum at the end of FY 2024, proving the ability to meet the AfriMet supply agreement.
Parsons says Andrada Mining received funding from the Development Bank of Namibia, Bank Windhoek, and Orion Resource Partners.
In November 2023, Orion Mine Finance provided a combined US$25m (incorporating share, convertible and warrant issue) funding package with US$12.5m allocated for accelerating the lithium and tantalum revenue streams.
Parsons says these partnerships, together with support from our shareholders, enabled us to achieve our objectives of expanding the production and supply of tin concentrate, tantalum commercial production, and lithium pilot production.
“We aim to achieve an annualised rate of 1 650 tonnes of contained tin. We are confident that the ring-fenced US$12.5m Orion tin royalty, combined with the Continuous Improvement Programme launched during the year at Uis Mine, will enable us to realise this objective,” Parsons says in the company’s annual and financial interim financials.
In the future, Andrada Mining wants to complete feasibility studies on the lithium production plan and validate the Uis drilling to improve the resource classification for tin while also providing an initial indication of lithium and tantalum.
The company also wants to produce saleable petalite concentrate bulk samples for ongoing testing with potential off-takers
Construct the pre-concentration circuit.
In addition, Andrada Mining wants to complete the CI2 Programme and tin validation drilling over the northern and central pegmatite clusters at Uis.
There are also plans to resume the Lithium Ridge exploration drilling and continue with the Brandberg West exploration drilling.

Share212Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Andrada secures N$98m local funding as Lithium Ridge drilling delivers high-grade results

Andrada pumps N$775m into Namibia’s economy in one year

November 2, 2026
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Ministry’s amendments delay Tower’s farm-out deal

November 2, 2026
Noronex launches 7,000m drilling campaign at Powerline Copper Project on Kalahari Copper Belt

Noronex, South32 plan 3,000m Kalahari copper drilling campaign

November 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe