• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, May 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Midas plans more drill rigs at Otavi copper-silver-gold project

    Midas plans more drill rigs at Otavi copper-silver-gold project

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

    Engo Valley uranium project maiden resource set for mid-third quarter 2026

    Trigon’s smart exit – walks away with about US$25m net gain and a debt-free future

    New Horizon revives dewatering strategy at Kombat Copper

    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

BW Energy defining the first exploration target well at Kudu project

by Editor
August 29, 2024
in Oil & Gas
0
534
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

BW Energy is working on defining the first exploration target well at the Kudu gas-power project.
The company is also working on securing long-lead items for an exploration program planned for 2025.
In early 2017, BW Energy entered into a farm-in agreement for a 56% operated interest, with Namcor holding a 44% joint venture interest.
BW Energy signed a Farm-up agreement with Namcor, increasing the company’s interest to 95% in the license and closed the transaction in 2021.
The Kudu gas discovery is in the northern Orange sub-basin, approximately 130 km off the southwest coast of Namibia.
It is situated in Petroleum Production License 003, which has an area of 4,567 square kilometres, and the field war depth is approximately 170 metres.
The field was discovered in 1974 with Kudu-1 and is delineated by seven subsequent wells.
BW Energy is preparing for an independent rig tender while talking with other operators in the Orange Basin about exploring common uses of available resources.
In the first quarter of 2022, the company signed an agreement to purchase the semi-submersible drilling rig West Leo from Aquadrill LLC for use at Kudu.
According to the 2024 half-year report, the analysis of data from the 2023 3D seismic survey and additional data over an adjacent area acquired in 2024 is progressing.
BW Energy is progressing with a revised development plan for the gas-to-power project.
The plan will utilize a repurposed semi-submersible drilling rig as a Floating Production Unit.
Repurposing will optimise the project timeline and significantly reduce capital investments compared to previous development concepts.
The revised development concept offers tangible financial, schedule, and environmental benefits.
Reusing existing facilities also substantially reduces field development-related greenhouse gas emissions compared to a newly built facility.
The revised integrated development plan aims to supply competitive power to a growing African market with significant upside potential.
On August 1, the company announced the acquisition of 17.6 million common shares and 17.6 million share purchase warrants of Reconnaissance Energy Africa Ltd. for an aggregate purchase price of approximately US$16 million.
BW Energy received a 20% non-operating interest in Namibia’s onshore Petroleum Exploration License 73 by participating in the equity raise.
This enables the company to expand its footprint in this strategically important energy region.

 

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Midas plans more drill rigs at Otavi copper-silver-gold project

Midas plans more drill rigs at Otavi copper-silver-gold project

May 20, 2026
Wia Gold offloads Côte d’Ivoire permits to focus on Kokoseb

Wia raises N$1.1b (A$92m) to fast-track Kokoseb Gold Project toward production

May 20, 2026
Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

May 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In