• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, July 27, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibian companies take leading role in Etango construction

    Namibian companies take leading role in Etango construction

    Frontier targets maiden Engo uranium resource in third quarter

    Frontier targets maiden Engo uranium resource in third quarter

    Noronex targets new Namibia drilling campaign before year-end

    Noronex targets new Namibia drilling campaign before year-end

    US$18b Venus project creates opportunities before first oil

    US$18b Venus project creates opportunities before first oil

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Optimine wins Kaoko Metals’ maiden exploration contract

    Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

    Langer Heinrich produces 4.82 Mlb U₃O₈, sells 4.35 Mlb in June quarter

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Master Power Technologies unveils R50m state-of-the-art customer experience centre at New Midrand premises

    Castrol changes ownership as bp streamlines business

    Castrol changes ownership as bp streamlines business

    Meren Energy says TotalEnergies has submitted Venus field development plan

    TotalEnergies secures approval for offshore licence swap

    Bannerman’s 16-year path to Namibia’s 4th uranium mine

    Approval for Chinese investment in Etango tied to jobs, local businesses

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Norasa drill results indicate potential to increase Valencia orebody resources and grades

by Editor
August 14, 2024
in News
0
Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project
522
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Forsys Metals says positive results from the ~10,000-meter drilling program at the Norasa Uranium project indicate a significant potential to increase the resources and grades around the Valencia orebody.
The program is designed to expand and upgrade the Valencia resources adjacent to the central pit.
At Valencia South, resource drilling intersected the most comprehensive grade interval of the program to date, returning an average of 210 ppm U3O8 over a 253-meter interval, including 16 meters at 655 ppm U3O8.
Additionally, VA24-022 intersected 363 ppm eU3O8 over 43 m from 366 to 409 m, and VA24-023 intersected 213 ppm U3O8 over 53 m from 179 m depth to the end of the pre-collar at 232 m.
At Valencia East, the best intersection was drill hole VA24-043 of 313 ppm U3O8 over 20 meters.
Exploration drilling at Valencia West intersected 222 ppm eU3O8 over 34 meters from 76 m to 110 m depth in drill hole VA24-052.
Exploration drill hole VA24-019 intersected 185 ppm U3O8 over 41 meters from 1 m to 42 m depth at the Jolie Zone.
At the Bundu Zone, the best intersection was in drill hole VA24-056 of 198 ppm eU3O8 over 28 metres from 1 m to 29 m depth.
Forsys country director Pine van Wyk said these high-grade intersections in the current drilling program demonstrate significant potential to increase resources and grades around the Valencia orebody.
“Multiple near-pit targets reported good grades that warrant follow-up work. The Valencia West extension exhibits exciting potential to add substantial resources to the Valencia orebody and enlarge the Valencia Main pit,” Van Wyk said.

Share209Tweet131
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibian companies take leading role in Etango construction

Namibian companies take leading role in Etango construction

July 27, 2026
Kendrick returns 112m at 3.03% TREO at Teufelskuppe rare earth project

Kendrick hits 4.04% rare earths at Teufelskuppe in southern Namibia

July 25, 2026
Frontier targets maiden Engo uranium resource in third quarter

Frontier targets maiden Engo uranium resource in third quarter

July 24, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In