• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, May 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Midas plans more drill rigs at Otavi copper-silver-gold project

    Midas plans more drill rigs at Otavi copper-silver-gold project

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

    Engo Valley uranium project maiden resource set for mid-third quarter 2026

    Trigon’s smart exit – walks away with about US$25m net gain and a debt-free future

    New Horizon revives dewatering strategy at Kombat Copper

    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

by Editor
August 13, 2024
in Oil & Gas
0
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin
529
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Namibia has invited Tower Resources to apply to enter the First Renewal Period of PEL 96 for 2–3 years.
Tower is the operator of the license PEL 96 with 80% working interest.
The mines ministry has also agreed to defer the company’s commitment to acquire 1,000 km2 of new 3D seismic data to the First Renewal Period.
The remaining work commitment for the Initial Exploration Period comprises the oil seep satellite analysis, play fairway analysis, development of an updated prospect, and lead inventory.
The high-grading of acreage is already substantially complete.
The company is evaluating significant stratigraphic and structural leads and prospects and plans to reprocess the previously acquired 2D seismic data over large license areas.
The evaluation of leads and prospects has required further time commitment due to the encouraging discovery of many substantial stratigraphic traps and the large anticlines and other structural traps that had already been identified.
The modelling work completed in 2023 had previously identified source rocks deep within the PEL96 portion of the Dolphin Graben, which is calculated to be mature for in excess of 100 to 150 billion barrels of oil generation.
Due to the variability of quality or coverage of data over some of these leads, the PEL 96 Joint Venture intends to reprocess the existing seismic data in these areas to extract as much information as possible from the original data files and significantly improve seismic data quality.
Tower Resources Jeremy Asher said their view of the prospectivity of PEL 96 has improved greatly since they began the current phase of work in 2019.
“We look forward to having sufficient data quality to share a more detailed picture of the structures we wish to explore further with the 3D data acquisition as soon as we have it.
“In the meantime, we plan to prepare a more detailed report summarising our findings and the main conclusions we will share with investors in due course.”
Tower Resources left Namibia in 2014 and surrendered its stake in PEL 10 in partnership with Repsol and Arcadia Petroleum.

Share212Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Midas plans more drill rigs at Otavi copper-silver-gold project

Midas plans more drill rigs at Otavi copper-silver-gold project

May 20, 2026
Wia Gold offloads Côte d’Ivoire permits to focus on Kokoseb

Wia raises N$1.1b (A$92m) to fast-track Kokoseb Gold Project toward production

May 20, 2026
Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

May 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In