• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, September 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Uncategorized

Golden Deeps moves into uranium exploration in Namib Desert

by Editor
July 31, 2024
in Uncategorized
0
Golden Deeps moves into uranium exploration in Namib Desert
535
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Golden Deeps has joined other companies that are hunting for uranium in the Namib Desert.
Until now, Golden Deeps has been focusing on vanadium-copper-lead-zinc-silver in the Otavi Mountain Land.
The company says it applied for five large EPLs totalling over 340km2 south of the Langer Heinrich Uranium Mine during the quarter ending July 31, 2024.
Golden Deeps targets repeat of the Langer-Heinrich deposit associated with paleochannels identified in satellite imagery. The company said it will provide further information on these EPL applications.
Golden Deeps joins Noronex, Gibs River Diamonds, NGX Limited, Oar Resources and Snow Lake Energy.
Cazaly Resources announced substantial mineral resource upgrades for its key Nosib and Abenab vanadium, copper, lead, zinc and silver deposits on its Otavi Mountain Land.
The new mineral resources represent an increase of 210,000 tonnes and an upgrade from entirely inferred mineral resources to two-thirds (66.6% by metal) of the mineral resources now in the measured and indicated categories, compared to the previous January 2019 Inferred Mineral Resource reported for the Abenab vanadium-lead-zinc deposit.
The company also says over 84% of the Nosib maiden mineral resource is within an optimised pit shell, and predominantly 90% is oxide mineralisation – associated with the vanadium-copper-lead hydroxide mineral mottramite, which metallurgical testwork has shown is readily recoverable using gravity concentration to produce a high-grade concentrate.
At the base of the pit, Nosib oxide mineralisation transitions to copper-silver strata bound arenite hosted sulphide deposit, which is open to the west where the grade and thickness increase.
The most westerly intersection of 44.22m @ 0.6% CuEq* (0.50% Cu, 3.2 g/t Ag) from 34.8m in NBSDD00712 includes a massive sulphide zone of 0.49m @ 10.3% Cu, 56.9 g/t Ag.
Further drilling is planned to extend this zone, targeting a substantial Cu-Ag sulphide Mineral Resource.
The company has also upgraded the Abenab vanadium, lead, and zinc deposits’ mineral resources from entirely inferred to predominantly indicated 75% by metal tons by incorporating more recent diamond drilling results and re-modelling the mineralisation.
The Abenab mineral resource has been optimised for underground mining.
The Abenab vanadium-lead-zinc mineralisation is hosted by a collapse breccia in carbonate rocks associated with the vanadium-lead-zinc hydroxide descloizite, which metallurgical testwork has shown is readily recoverable using gravity concentration to produce high-grade concentrate.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

September 21, 2026
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In