• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Elevate Uranium working to convert existing inferred resource to JORC indicated resource at Koppies

by Editor
July 25, 2024
in Uranium
0
Elevate Uranium working to convert existing inferred resource to JORC indicated resource at Koppies
510
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Elevate Uranium’s managing director, Murray Hill, said the five reverse circulation drill rigs at Namibia’s uranium assets are progressing well.
Three drill rigs are operating at Koppies, converting the existing inferred resource to JORC indicated resource.
The other two drill rigs are focusing on the Hirabeb and Capri projects to delineate further mineralisation identified from previous broad-spaced exploration drilling programs.
Each rig typically completes approximately 25 holes per week for a weekly total of 125 holes between the five rigs.
Hill said the infill drilling programs are meant to increase the confidence level of the Koppies resources and add pounds to the other projects.
Koppies is one of the shallowest uranium resources globally, with approximately 95% of the total mineral resource within 18.5 metres and 50% within 7 metres of the surface.
These parameters imply a potential low strip ratio and low-cost mining operation at Koppies, which would benefit the overall economics of any future operation.
“We have drilled 1,979 holes for 52,698 metres on the programs on these three projects alone this calendar year, in addition to holes drilled at Koppies before the resource update in April,” Hill said.
At Hirabeb, Hill said they achieved some excellent results, including 15.5 m at 599 ppm U3O8 and 12.0 m at 451 ppm U3O8, 7.5 m at 616 ppm U3O8 and 4.0 m at 1,198 ppm U3O8. “These programs are an essential step towards developing our projects, and we are encouraged by the progress made so far this year,” he said.
The company will now undertake a detailed metallurgical testwork program on about six tonnes of Koppies bulk ore samples in transit to a metallurgical testwork facility in Perth.
The results of this bench scale program will be used to design the pilot plant.
The Hirabeb Uranium Project is the second of the company’s four discoveries in four years, after Koppies.
The Hirabeb mineralisation is only 25 kilometres from the southern portion of the Koppies resource and is part of the greater Koppies Project area.
The program undertaken during 2024 has occurred in two phases.
The first phase targeted Koppies 3 style mineralisation around the extremities of the tenement.
The program’s current phase is on the known mineralised area to confirm the extent of the main mineralised envelope to delineate and report a maiden resource later this year.
Four hundred forty-five holes for 10,581 m have been drilled this calendar year.
The Capri Uranium Project is only 25 kilometres from the Company’s Marenica Uranium Project.
The initial phase of drilling consisted of greenfield exploration holes targeting Koppies 3 style mineralisation on the western edge of the tenement.
The program’s second phase then moved the known mineralised area where the distance between drill lines varied between 800 and 2,500 metres apart to cover the 16 km extent of mineralisation.
The infill drill program will close the spacing between drill lines to define the mineralisation outline better.
A total of 256 holes for 7,225 m have been drilled in 2024.

Share204Tweet128
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In