• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 28, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Deep Yellow says Tumas engineering now more than 60% complete

    Deep Yellow says Tumas engineering now more than 60% complete

    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Nickel

African Nickel Ltd to declare Kunene Nickel project maiden resource end of 2024

by Editor
June 25, 2024
in Nickel
0
Mapping Namibia’s nascent nickel projects
590
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

African Nickel Limited will declare the maiden resource for the Kunene Nickel project at the end of 2024.
The South African-based company has a 75% interest in EPLs 7609 (6372 ha) and 7610 (4931 ha), under which the Kunene Nickel project resides.
The Kunene Nickel project deposit has an estimated yield of 91.60 Mt, which has been identified on the surface of the Ombuku North area of the project.
The company was also negotiating to acquire EPL 4361 (30,000 ha) and enter into a JV or royalty agreement with the holder.
The company is currently conducting the scoping study and metallurgical testwork.
In June 2023, African Nickel started a focused exploration programme to declare a potentially significant maiden compliant resource by the first half of 2024.
In May 2024, African Nickel Limited said it was seeking between US$2.5 million and US$5 million to fund the Kunene Nickel Project in Namibia.
Africa Nickel started metallurgical test work, leading to a pre-feasibility study in August 2023.
The initial test work indicated the presence of nickel and copper, cobalt, and platinum-group metals.
African Nickel also commissioned a concept study on mining the Kunene orebody in November 2022, and the reasonable prospect of economic extraction estimate for surface and underground mining is at an advanced stage.
In November 2022, African Nickel commissioned a competent person report and a preliminary compliant resource quantification done during the first quarter of 2023 in the Ombuku North target.
The audio magnetotellurics (AMT) geophysical survey work completed by mid-Jun 2023 will allow accurate drill work planning in Ombuku North and South.
Also, in June 2023, African Nickel completed a desk-top study on metallurgical strategy for Kunene. In July, the company started extracting a bulk sample with Bench Scale.

Share236Tweet148
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Public review opens for Koppies West uranium project application

Elevate grows Namibian uranium footprint to 116 million pounds

April 28, 2026
Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

Galp confirms three-well drilling and testing campaign for Mopane

April 28, 2026
Deep Yellow says Tumas engineering now more than 60% complete

Deep Yellow says Tumas engineering now more than 60% complete

April 28, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In