• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 13, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Let’s  turn our stones into bread – Swapo secretary general Shaningwa

    Let’s turn our stones into bread – Swapo secretary general Shaningwa

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Ongombo copper-gold project’s ESIA at an advanced stage

    Ongombo copper-gold project’s ESIA at an advanced stage

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Xinfeng wins battle over Orange River Mining ownership

    Xinfeng wins battle over Orange River Mining ownership

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Prospect Resources slows down exploration at Omaruru lithium project pending internal data review

by Editor
June 20, 2024
in Lithium
0
Prospect Resources short of N$4.8m to earn 51% in Osino Resources’ Omaruru lithium project
533
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Prospect Resources will slow down exploration activities at the Omaruru lithium project pending an internal review of the data generated during phase 2 drilling.
The Omaruru Lithium Project (Omaruru), comprising the EPL 5533 tenement, is centred on the village of Wilhelmstal, east of Karibib in Namibia, covering 131 square kilometres.
Prospect Resources acquired Richwing Exploration from Osino Resources for N$1.4 million (US$75,000) in cash.
Richwing Exploration holds the rights to the Omaruru Lithium Project.
Prospect Resources said exploration activities are set to be pared back to minimum holding commitments whilst additional lithium prospectivity within the licence for future drill targeting is evaluated.
The company further said that completing the Phase 2 drilling programme at Omaruru and the recent acquisition of 100% interest has laid the platform for re-assessing its priorities free of the original earn-in obligations of the preceding JV Agreement with Osino Resources.
The decision comes after the company returned no significant lithium intersections at Spirit Minor, two encouraging intersections at the Brockmans deposit out of 14 reverse circulation holes, and a considerable intersection at the Bergers series of deposits out of 12 reverse circulation holes.
A total of six mixed Rotary Air Blast and reverse circulation holes for 453m were completed at Spirit Minor, but no significant intersections were returned.
Prospect Resources said the geological interpretation is that the valley represents a structural break between the two outcropping lobes and that mineralisation is not present, or has been weathered away over time, at this structure.
“Due to its small size, further work is not warranted at the Spirit prospect,” the update said.
During the Phase 2 drilling programme at Brockmans, Prospect Resources said 14 RC holes for 1,129m were completed, and two encouraging intersections just over 800m north of OMR018 were returned.
These included 3m @ 0.74% Li2O from 56m and 3m @ 0.51% Li2O from 46m.
The deposit is now interpreted geologically as being structurally controlled with two specific regions mineralised with higher-grade lithium at either end of the kilometre-long surface outcrop.
The company identified areas still open at depth and would require future drilling to ascertain their volumetric extent.
Phase 2 drilling at Bergers consisted of 12 reverse circulation holes for 637m and four royal air blast holes for 200m.
The work produced a single significant intersection of 2m @ 0.83% Li2O from 42m in one drill hole and has downgraded the potential of Bergers, which now indicates that the surface pegmatite expressions do not thicken and coalesce at depth, as had been interpreted.

Share213Tweet133
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

May 12, 2025
Let’s  turn our stones into bread – Swapo secretary general Shaningwa

Let’s turn our stones into bread – Swapo secretary general Shaningwa

May 11, 2025
Uranium mines in Erongo face a 500 cubic meter per hour water deficit

Uranium mines in Erongo face a 500 cubic meter per hour water deficit

May 9, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe