• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, September 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Karibib Lithium Project site works to start in May, mining expected early 2025

    Karibib lithium project’s long run of bad luck

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Unicorn draws £1.25m to advance Klein Aub copper mine acquisition

    Core Energy seeks drilling contractor for maiden Barking Gecko uranium campaign

    Core Energy sets 2027 exploration horizon for Namibia uranium portfolio

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Keras puts US$3m behind entry into Namibia’s Kaoko copper belt

    Arkle identifies extensive uranium system in maiden Namibia drilling

    Arkle identifies extensive uranium system in maiden Namibia drilling

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    ReconAfrica seeks clearance to transport hazardous chemicals for KW1X testing

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow yet to decide Tumas debt size before Nedbank goes to market

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow advances Omahola, S-Bend and Tinkas alongside Tumas

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow spends N$600m on Tumas in 2026 financial year

    Deep Yellow builds Namibian base as local workforce reaches 45

    Deep Yellow builds Namibian base as local workforce reaches 45

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Snow Lake Resources field crew set up camp at Engo Valley ready for exploration

by Editor
June 4, 2024
in News
0
Snow Lake Resources field crew set up camp at Engo Valley ready for exploration
579
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

A Snow Lake Resources field crew has set up a camp at the Engo Valley Uranium Project, ready to start the 2024 exploration program.
Snow Lake Resources entered into a binding letter of intent with a private British Columbia company, Namibia Minerals and Investment Holding, to acquire up to 85%.
Namibia Minerals and Investment Holding is the sole registered and beneficial owner of 100% of the rights, title, and interests in EPL-5887.
Although the acquisition remains subject to customary closing conditions, Snow Lake has designed a multi-phase exploration program for 2024.
Exploration field crews began mobilising to the site in May to undertake the field portion of Phase 1 of the program.
Results from the radon cup survey, the initial phase of drilling, and the downhole gamma logging will inform the second round of drilling.
Snow Lake Resources CEO Frank Wheatley said the exploration field crews have started the first exploration program on the Engo Valley Uranium Project since the 1970s.
“The topographical survey, ground geophysics, and the radon cup survey are well underway, and our crews continue to locate drill collars from the historic 1970s drill campaign in anticipation of the first drill program to be undertaken on the project in the past 40 years,” Wheatley said.
The project is located on the Skeleton Coast, in the Opuwo District of the Kunene Region, along the coast of northwest Namibia, approximately 600 kilometres north of Swakopmund, Namibia.
It covers an area of 69,530 hectares, is valid until February 12, 2026, and covers base and rare metals, industrial minerals, non-nuclear fuel minerals, nuclear fuel minerals, precious metals, and precious stones.
It is accessible from the south via 190 km of desert track roads from Mowe Bay via the Sarusas mine.
To the east, unconfirmed track roads connect the project area to the settlement of Orupembe.
Uranium mineralisation was discovered on the project in 1973. Gencor conducted intermittent exploration between 1974 and 1980, and based on that work, Gencor calculated a historical, non-current mining code-compliant resource estimate for the project.
The project is considered to be a top-tier exploration project.

Share232Tweet145
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Karibib Lithium Project site works to start in May, mining expected early 2025

Karibib lithium project’s long run of bad luck

September 19, 2026
Langer Heinrich builds boundary wall for Usakos school

Langer Heinrich builds boundary wall for Usakos school

September 18, 2026
Sultan Resources allocates N$13.3m to kickstart Namibia’s Damara Gold Project

Sultan applies for an additional 171 km² copper-gold ground in Kalkfeld

September 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In