• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, August 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Namibia gives Pancontinental one year to prove PEL 87

    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Midas targets three copper resources within six months

    Midas targets three copper resources within six months

    Askari Metals to become Highland Metals in strategic rebrand

    Askari Metals to become Highland Metals in strategic rebrand

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada returns 14.72% Li₂O as Lithium Ridge expands to 9km

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Green Hydrogen

First hydrogen-fuelled tug vessel, locomotives planned for Namibia

by Editor
May 10, 2024
in Green Hydrogen
0
First hydrogen-fuelled tug vessel, locomotives planned for Namibia
569
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

O&L and CMB-Tech plan to build the world’s first hydrogen-fueled tugs through their joint venture, Cleanergy Solutions. 

CMB-Tech has also partnered with TransNamib, Hyphen Technical, CMB Tech, and the University of Namibia (UNAM) are partners in the HyRail project.

Although there is no timeline for tug boats, the International Rail Journal quote National Planning Commissioner Oberth Kandjoze saying that the rail project under HyRail is expected to be commissioned by the end of 2025.

Cleanergy Solutions has launched the first-ever green hydrogen service station in Namibia and Africa and is now targeting other projects, including building a Multifunctional Port Utility Vessel (MPHUV) powered by dual-fuel hydrogen engines. 

The partners say the vessel can integrate different equipment for port operations because of its versatile design.

Additionally, using a green hydrogen-powered vessel will reduce greenhouse gas emissions.

The parties say the Port of Antwerp Bruges and Namport will be involved.

The HyRail project involves converting two diesel locomotives to run on green hydrogen. The project has €9.17 million war chest.

In addition, the Port of Antwerp Bruges, working with the Port of Walvis Bay, wants to invest about US$265 million in a hydrogen and ammonia storage and export facility.

Share228Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Namibia gives Pancontinental one year to prove PEL 87

August 1, 2026
Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

July 31, 2026
JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

July 31, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In