• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, April 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Tantalum

HeBei Construction CC spends N$40m on equipment for the Swanson Tantalum Mining Project

by Editor
May 6, 2024
in Tantalum
0
HeBei Construction CC spends N$40m on equipment for the Swanson Tantalum Mining Project
569
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

HeBei Construction CC has spent about N$40 million (A$3,245,000) ordering equipment for the Swanson Tantalum Mining Project. 

The project is expected to be in production by the first quarter of 2025.

Arcadia Metals owns the project, which has a license number of 223, and HeBei wants to acquire 49% of it. 

The Swanson Tantalum Project, under EPL 5047, is about 15km north of the Orange River. 

Arcadia announced on November 28, 2022, that HeBei had agreed to invest US$7,5 million into the Swanson Tantalum Project in return for a 49% interest in the offtake of lithium produced as a secondary stream of product following the production of Tantalum concentrate. 

The investment comprised cash, machinery, road construction and services.

Hebei started the construction of the road between the Swanson Mine Site and the Plant Site in July 2023 to allow for the carriage and installation of plant and equipment—jaw crusher, cone crusher, feeder, screen and conveyors—currently sourced from Namibia, the Republic of China, and the United Kingdom.

Arcadia Metals says HeBei has completed constructing the access road from the nearest traversable to the Swanson processing site and is now working on the ore supply road.

Additionally, HeBei will start installing a power line and constructing the service road this May.

HeBei has also started the process of appointing a project manager to coordinate project readiness and construction.

The processing equipment, including multi-gravity separators and a spiral circuit, has been ordered and deposits paid, and it is expected to arrive on-site during October 2024. 

A May 2023 definitive feasibility study into the Swanson tantalum/lithium project estimates that the mine will produce an average of 12,500 tonnes a month over a life of eight years.

Share228Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

April 24, 2026
Askari Metals keeps reduced team at Uis project for low-cost but high impact

Askari Metals reports high-grade tin, lithium and tantalum assays at Uis

April 24, 2026
Prospect Resources ‘forgotten’ lithium project

Prospect Resources seeks partners for Omaruru lithium project after exploration halt

April 23, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In