• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, June 7, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Oil & Gas

88 Energy plans first oil well in Owambo onshore basin in second half of 2025

by Editor
April 18, 2024
in Oil & Gas
0
88 Energy plans first oil well in Owambo onshore basin in second half of 2025
793
SHARES
2.3k
VIEWS
Share on FacebookShare on Twitter

88 Energy plans to drill a potential initial exploration well on PEL 93, targeting the Damara play in the Owambo Basin as early as the second half of 2025.

PEL 93 includes an extensive lead portfolio with ten significant independent structural closures identified from a range of geophysical and geochemical techniques, and there is potential for more leads to be identified as the dataset is expanded.

88 Energy says PEL 93 is ten times bigger than its Alaskan portfolio and more than 70 times larger than its Project Phoenix.

In November 2023, 88 Energy executed a three-stage farm-in agreement for up to 45% non-operated working interest.

88 Energy will earn 20% in the first stage, 37.5% in stage two, and 45% in stage three.

88 Energy expects to invest N$359 million (US$18.7 million).

Monitor Exploration Ltd. has 55%, Legend 15%, and Namcor 10%. Before the acquisition of the 20%, Monitor Exploration had 75% shares in the EPL.

The company says it plans to start with a low-impact 200-line kilometre 2D seismic program to confirm the structural closure of the 10 independent leads identified by Monitor Exploration since 2018.

Monitor Exploration used various geophysical and geochemical techniques to assess and validate the acreage’s significant potential.

88 Energy says the 2D seismic program will be in mid-2024, after planning, public consultation, updating of environmental compliance requirements, and relevant approvals.

The results from the 2D seismic program will be incorporated into existing historical exploration data over the acreage and used to identify possible exploration drilling locations.  

According to 88 Energy, ReconAfrica’s recent drilling results in the Kavango basin have highlighted the potential of a new and underdeveloped conventional oil and gas play in the Damara Fold Belt.

“Historical assessment utilised a combination of techniques and interpretation of legacy data to identify the Owambo Basin and specifically blocks 1717 and 1817 as having significant exploration potential,” the company says in its quarterly report for the period ended March 31, 2024.

As of December 31, 2024, 88 Energy had a cash balance of N$214 million (A$17.5 million) and no debt, while net cash outflows concerning operating expenses for the first quarter of 2024 totalled N$943.000 (A$0.77 million) compared to N$17.6 million (A$1.44 million) in the same quarter in 2023. 

The company says cost reduction initiatives commenced in the quarter, targeting a reduction in salary and overhead costs. 

 

Share317Tweet198
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe