• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, June 2, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    B2Gold Namibia spends US$107m on local procurement in 2024

    B2Gold Namibia spends US$107m on local procurement in 2024

    Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

    Alfred H. Knight celebrates 10 years of supporting Namibia’s mining, agriculture sectors

    Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

    Koryx strengthens Haib technical team, plans bringing additional drill rigs ahead of updated technical report

    Midas Minerals acquires Otavi South Copper Project, extends footprint in Namibia

    Midas Mineral seeks US$6.5m for acquiring and exploring Otavi copper projects

    Askari Metals plans rock chip, license-wide soil geochemical sampling campaign for Uis Lithium Project

    Askari Metals plans rock chip, license-wide soil geochemical sampling campaign for Uis Lithium Project

    Marine site investigator GEOxyz sets first African shop in Namibia

    Marine site investigator GEOxyz sets first African shop in Namibia

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals report strong potential economic uranium grades at Etango North-East Project

    Gratomic Inc hit by executive exodus

    Gratomic Inc hit by executive exodus

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Andrada Mining reports tin, lithium and tantalum production increases

by Editor
March 27, 2024
in News
0
Andrada Mining reports tin, lithium and tantalum production increases
536
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining says processed tin ore at its Uis Tin Mine increased by 60% year-on-year to 915 599 tonnes, while tin concentrate production increased by 54% to 1 474 tonnes in the period ended February 29, 2024.
The company says this is due to the plant processing rate in 2023, which increased by 29% year-on-year to 137tph.
Annual tin concentrate production increased by 54% to 1,474 tonnes, resulting in a 51% increase in contained tin to 885 tonnes year-on-year.
Contained tin tonnage produced in the fourth quarter increased by 14%, a higher rate than the 7% increase in tin concentrate, due to tantalum concentrate separation.
The tantalum extraction increased the tin concentrate grade by 16% between December 2023 and February 2024.
Andrada Mining says it completed the circuit optimisation, which resulted in the production of 7.4 tonnes of tantalum concentrate during the fourth quarter.
The current concentrate production rate is 48tpa and is expected to increase to approximately 83tpa after the ore-sorting facility is implemented.
The company is on track to supply tantalum to AfriMet on a quarterly basis, commencing March 2024.
The revenue from the tantalum concentrate is anticipated to increase total group revenue by between 3% and 5%.
Andrada Mining says approximately 40 tonnes of saleable, technical-grade lithium concentrate was produced and stockpiled by the end of the reporting period.
The production rate is expected to increase to 100 tonnes per month by the end of March 2024.
Internal test work confirms that this technical-grade material meets the specifications for the glass-ceramics market, and Andrada is exploring additional offtake agreements with both industrial and battery chemical markets.
According to Andrada Mining, all unit costs were at the lower level of management guidance for the entire year.
Andrada Mining CEO Anthony Viljoen says the strategic and operational initiatives have been successful and yielded further double-digit percentage increases in production tonnage at our operations, which we are presenting today.
“Although the higher stripping resulted in an increase in the AISC during the year, the exposure of the orebody’s grade, diversity of minerals including lithium, and scale at depth according to our geological model, will start to become glaringly apparent, placing the operations in a robust position to capitalise on the rebound in the commodities markets for all our products,” Viljoen says.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Northern Graphite plans restarting Okanjande in 2027

Northern Graphite plans restarting Okanjande in 2027

May 30, 2025
ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

May 30, 2025
Kombat sale deal signed and sealed, awaits shareholder approval

Kombat sale deal signed and sealed, awaits shareholder approval

May 29, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe