• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 10, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project

by Editor
March 26, 2024
in News
0
Forsys Metals starts a 29-borehole drilling program at Valencia Uranium Project
543
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Forsys Metals Corp has started the 2024 drilling program at its Valencia Uranium Project in Namibia.
The Valencia Uranium Project under mining licence 149 is part of Forsys Metals, Norasa Uranium Project.
Forsys Metals owns the Norasa project, which has a 25-year mining licence, and has a 100% interest in the Namibplaas project under EPL 3638.
Valencia project, on the farm Valencia 122, about 75km northeast of the town of Swakopmund, covers 735.6 ha.
The company says it has started the drilling program by investigating three zones of potential mineralisation outside the existing resource block model.
The drilling program focuses on three target areas: the Jolie Zone (~ 1km north of Valencia pit), Valencia West Extension and Valencia South.
Forsys Metals has scheduled to drill 29 boreholes targeting 5.236m to assess mineralisation to depths of up to 380m below the collar.
The company said on Tuesday that the three areas of mineralisation potential were delineated from historical exploration work, which included aerial photo interpretation, geological mapping, aeromagnetic surveys, airborne and ground scintillometer surveys, and exploration drilling.
“Investigation by drilling is required to define the mine’s surface infrastructure development and explore resource upside potential in these areas,” Forsys Metals said.
Forsys Metals provided the 2023 assay results from Valencia 2023, where it drilled 2.684.44 metres using 15 boreholes.
The drill program sought to test and assess pit slope stability and optimise pit design.
It also sought to test the continuity of mineralisation for resource modelling and confirm mineral resource estimation (MRE) parameters.
Forsys Metals sent 819 samples from 10 boreholes for testing to establish quality control protocol and procedures.
The company says the chemical results show the intersecting of multiple zones of massive alaskite intrusions and confirm uranium mineralisation in all six confirmed boreholes.
“Best mineralised borehole PQ-5 intersected 77.34 m of continuous mineralisation, averaging 439 ppm U3O8, including 41.9 m of 683 ppm U3O8,” Forsys Metals says.

 

 

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

June 10, 2025
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe