• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, June 10, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

    Rössing Uranium spends N$4.37b buying locally in 2024

    Rössing Uranium spends N$4.37b buying locally in 2024

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    Elevate Uranium target maiden mineral resource estimate for Namib IV later 2025

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica seeks to raise N$130m for Kavango West-1X well exploration

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Midas Minerals targets Q2 2025 for drilling at Otavi and South Otavi copper, gold, silver projects

    Consolidated Copper appoints Stegmann interim chief operating officer

    Consolidated Copper appoints Stegmann interim chief operating officer

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Arcadia Minerals announces positive stream sediment results for nickel & copper in Karas

    Northern Graphite plans restarting Okanjande in 2027

    Northern Graphite plans restarting Okanjande in 2027

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    ReconAfrica moves closer to spudding Prospect I on PEL 73 Kavango Basin

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Askari Metals completes phase 1 trenching at Uis Lithium project, plans multiple explorations across all licences

by Editor
March 25, 2024
in News
0
Askari Metals completes phase 1 trenching at Uis Lithium project, plans multiple explorations across all licences
555
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Askari Metals has completed the Phase I trenching program at the Uis Lithium Project EPL 7345 and is focusing on a multiple exploration campaign to generate additional targets across its licences.
The Uis Lithium Project, under EPLs 7345 and 8535, covers 308.12 km2 and is within the Erongo Region.
The Phase 1 trenching program at EPL 7345 targeted four high priority pegmatites, being the OP, K9, DP and PS pegmatite targets.
The trenching, mapping and channel sampling campaign generated 2,098 individual 1m channel samples, which have been dispatched to Act Labs for analysis.
Results are expected to be received systematically over the next few weeks.
Mapping and rock chip sampling on EPL 8535 have also revealed a significant LCT-type pegmatite body named the Kestrel pegmatite target, where mapping has determined the pegmatite is larger than initially thought with a 24m average width over a mapped strike extent of 1.4km.
The Kestrel pegmatite has identified typical LCT mineralisation, including spodumene, petalite and lepidolite, across its entire strike length.
Askari Metals plans high-impact, low-cost exploration campaigns to generate robust, high-confidence drill targets at EPL 7345 as Phase 2 and EPL 8535 as Phase 1 during 2024.
Uis Lithium Project chief exploration and project manager Cliff Fitzhenry said the successful completion of mapping and channel sampling at EPL 7345 has delivered better than expected results.
Fitzhenry said the discovery of a larger than anticipated pegmatite zone at the OP target, in particular, stretches over two kilometres and contains several smaller pegmatite bodies interpreted to be bifurcating offshoots from the main body.
According to Fitzhenry, they discovered promising trench exposures for the DP, PS and K9 targets and further success was reported following mapping and sampling at the Kestrel target on EPL 8535, which has revealed a significant pegmatite body averaging 24 kilometres wide over a strike length of 1.4 kilometres.
“Planning is at an advanced stage for further multi-stream exploration programs at Uis, which will feed into a Phase 1 trenching program on EPL 8535 and a follow-up Phase 2 trenching program on EPL 7345.
“The next few months promise a steady flow of news from Uis, with results from samples taken during the Phase 1 trenching campaign at EPL 7345 expected imminently. The planned work programs and subsequent results are expected to underpin our resource definition drill programs on these key pegmatite targets later this year,” Fitzhenry said.

 

Share222Tweet139
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

New mineralisation at Elevate Uranium’s Marenica project, displaying an interval of 13m at 203 eU3O8 ppm

June 10, 2025
Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

Andrada Mining processes 254,745 tonnes of tin in quarter ended May 31

June 6, 2025
Rössing Uranium spends N$4.37b buying locally in 2024

Rössing Uranium spends N$4.37b buying locally in 2024

June 5, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe