• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 10, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Ongombo copper-gold project’s ESIA at an advanced stage

    Ongombo copper-gold project’s ESIA at an advanced stage

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Askari Metals keeps reduced team at Uis project for low-cost but high impact

    Xinfeng wins battle over Orange River Mining ownership

    Xinfeng wins battle over Orange River Mining ownership

    Arcadia Minerals engaging potential development partners for four of its five projects

    Arcadia Minerals engaging potential development partners for four of its five projects

    Canadian company buys two greenfield uranium EPLs in Erongo region for N$14,9m

    Canadian company buys two greenfield uranium EPLs in Erongo region for N$14,9m

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Trigon processes 81.479 tonnes of copper ore, lost N$154m three months

by Editor
February 28, 2024
in Copper
0
The story of Kombat Mine: Flooded three times but rose to still provide copper
543
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Trigon Metals processed 81,479 ore at an average grade of 0.95% copper, falling short of 87,000 tonnes at 1.2% at the Kombat mine in Namibia in the quarter ending December 31, 2023.
The company says the upcoming twelve months mark a pivotal period as Kombat’s underground operations resume after a 17-year hiatus in care and maintenance.
Trigon says it has reviewed its strategy, mine planning, and capital for both open pit and underground operations to manage restart risks and ensure a high-grade product for the plant.
Progress in dewatering the Asis West mine’s two shafts is substantial, with the first planned mining shaft currently dewatered down to 250 meters from the collar to the 8th level.
Accelerated underground mining will access higher-grade ore, with production ramping up to 15 thousand tonnes of high-grade ore per month in Q1 2025.
According to Trigon, this shift displaces 15ktpm of lower-grade open pit ore, maintaining an aggregate ore production of 30ktpm, enhancing overall production quality and thus margin and cash flow.
“Given these developments, Trigon has decided to postpone the expansion of its processing plant capacity from 30ktpm to 60ktpm, initially planned for 2024 to 2025,” the company says.
It added that this delay allows the underground operations to establish a performance track record and be ramped to a steady state of 30ktpm, ensuring a prudent and informed expansion timeline.
During the quarter, Trigon made an operating profit of US$581,518 for the three months and US$474,722 for the nine months ending December 31, 2023.
The net losses for the three months of US$8,095,812 and US$14,914,218 for the nine months ending December 31, 2023, were primarily as a result of the non-cash accretion of the Sprott stream advances and depreciation of property plant and equipment of US$7,656,790 for the three months and US$12,406,984 for the nine months ending December 31, 2023.
Reduced net operational cash outflows of US$2,554,215 for the nine months versus US$5,553,687 for the nine months ending December 31, 2022, attests to management’s emphasis on operational cost control measures implemented pre-production and during the commissioning process.

Share217Tweet136
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Uranium mines in Erongo face a 500 cubic meter per hour water deficit

Uranium mines in Erongo face a 500 cubic meter per hour water deficit

May 9, 2025
Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

May 8, 2025
Consolidated Copper’s restart of Central Operations based on 10-year mine plan

Consolidated Copper’s restart of Central Operations based on 10-year mine plan

May 8, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe