• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, September 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Namibia renews Ongombo Copper-Gold Project EPL for two years

by Editor
February 9, 2024
in News
0
Namibia renews Ongombo Copper-Gold Project EPL for two years
637
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Namibia has renewed the Ongombo Copper-Gold Project EPL 5772 for two years, while the Environmental and Social Impact Assessment (ESIA) is at an advanced completion stage.
African Pioneer owns 85% of the Ongombo Copper-Gold Project near Windhoek said pre-production planning to make the transition from exploration to mining is now underway.
The project received a 20-year mining licence 240 on August 10, 2022.
The company informed shareholders on February 7 that discussions with multiple parties about project-level funding of the Ongombo Project were at an advanced stage.
The funding will enable progression of the initial Ongombo open pit to exploit the easily accessible surface ore resources.
In this context, African Pioneer said, engineering design of pre-production works has commenced along with design of the lay-out of internal access roads and the accommodation, office upgrades and fencing required to securely operate the mine site.
African Pioneer also said the X-ray transmission ore sorting sensor tests returned positive results and that laser or colour sensor technology can be used to separate ore and waste.
In May 2023, African Pioneer announced an updated total Indicated Mineral Resource Estimate (MRE) of 5.7Mt at 1.1% Cu Equivalent (CuEq), 0.94% Cu and 0.23g/t Au and a very substantial Inferred underground potential Resources of 23Mt at 1.1% CuEq, 0.95% Cu and 0.24g/t Au.
African Pioneer executive chairperson Colin Bird said they have made good progress on the Ongombo Project with very significant increases to the previous ‘Indicated’ and ‘Inferred’ Mineral Resources and the potential for a ‘starter’ mine using low-cost open-pit methods.
“We plan to combine XTR with laser dry sorting technology to separate ore from waste and generate a high-grade concentrate for transport to an in-country processing plant for final separation before metal recovery,” he said.
Bird added that they were sequencing the primary development infrastructure and the process flowsheet.
“As we advance towards the completion of the ESIA we expect to soon be in a position to move towards project implementation and the completion of development financing,” he said.

Share255Tweet159
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

September 24, 2026
Engineering review identifies pathway to lift Kokoseb plant to 7Mtpa

Engineering review identifies pathway to lift Kokoseb plant to 7Mtpa

September 24, 2026
Ongombo copper mine owner secures £1m convertible loan

Xinhai Ongombo deal meets all conditions

September 23, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In