• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, July 31, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Kaoko retains N$20.7m of first year exploration budget for Namibian projects

    Midas targets three copper resources within six months

    Midas targets three copper resources within six months

    Askari Metals to become Highland Metals in strategic rebrand

    Askari Metals to become Highland Metals in strategic rebrand

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Customs clearance delays Elevate’s uranium beneficiation pilot plant results release

    Andrada confirms lithium grades of up to 3.46% at Lithium Ridge

    Andrada returns 14.72% Li₂O as Lithium Ridge expands to 9km

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Deep Yellow spends about N$725m on Tumas during 12 months to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Bannerman’s Etango spending reaches about N$800 million in the year to June 2026

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Deep Yellow to mobilise Tumas contractors in August as project advances towards anticipated FID

    Namibian companies take leading role in Etango construction

    Namibian companies take leading role in Etango construction

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News

Namibia renews Ongombo Copper-Gold Project EPL for two years

by Editor
February 9, 2024
in News
0
Namibia renews Ongombo Copper-Gold Project EPL for two years
636
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Namibia has renewed the Ongombo Copper-Gold Project EPL 5772 for two years, while the Environmental and Social Impact Assessment (ESIA) is at an advanced completion stage.
African Pioneer owns 85% of the Ongombo Copper-Gold Project near Windhoek said pre-production planning to make the transition from exploration to mining is now underway.
The project received a 20-year mining licence 240 on August 10, 2022.
The company informed shareholders on February 7 that discussions with multiple parties about project-level funding of the Ongombo Project were at an advanced stage.
The funding will enable progression of the initial Ongombo open pit to exploit the easily accessible surface ore resources.
In this context, African Pioneer said, engineering design of pre-production works has commenced along with design of the lay-out of internal access roads and the accommodation, office upgrades and fencing required to securely operate the mine site.
African Pioneer also said the X-ray transmission ore sorting sensor tests returned positive results and that laser or colour sensor technology can be used to separate ore and waste.
In May 2023, African Pioneer announced an updated total Indicated Mineral Resource Estimate (MRE) of 5.7Mt at 1.1% Cu Equivalent (CuEq), 0.94% Cu and 0.23g/t Au and a very substantial Inferred underground potential Resources of 23Mt at 1.1% CuEq, 0.95% Cu and 0.24g/t Au.
African Pioneer executive chairperson Colin Bird said they have made good progress on the Ongombo Project with very significant increases to the previous ‘Indicated’ and ‘Inferred’ Mineral Resources and the potential for a ‘starter’ mine using low-cost open-pit methods.
“We plan to combine XTR with laser dry sorting technology to separate ore from waste and generate a high-grade concentrate for transport to an in-country processing plant for final separation before metal recovery,” he said.
Bird added that they were sequencing the primary development infrastructure and the process flowsheet.
“As we advance towards the completion of the ESIA we expect to soon be in a position to move towards project implementation and the completion of development financing,” he said.

Share254Tweet159
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

Chinalco commits US$1m to Opuwo Cobalt Project exploration before takeover closes

July 31, 2026
JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

JOGMEC, Toyota Tsusho form company to carry Lofdal 50% shares

July 31, 2026
Kaoko retains N$20.7m of first year exploration budget for Namibian projects

Kaoko retains N$20.7m of first year exploration budget for Namibian projects

July 31, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In