• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 19, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

    Navachab welcomes 28 apprentices

    Navachab welcomes 28 apprentices

    Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

    Engo Valley uranium project maiden resource set for mid-third quarter 2026

    Trigon’s smart exit – walks away with about US$25m net gain and a debt-free future

    New Horizon revives dewatering strategy at Kombat Copper

    Koryx Copper to raise N$26.6m from selling 16 million shares

    Koryx reports 150m at 0.45% CuEq, targets 92,000t annual copper output at Haib

    Omitiomire – Namibia’s next copper mine

    Appian Capital Advisory acquires 95% stake in Omitiomire Copper Project

    Langer Heinrich Mine hits 3 million pounds output as final ramp-up phase begins

    Langer Heinrich increases production to 1.29 million pounds in last quarter

    ReconAfrica might need more money for Kavango West drilling

    ReconAfrica targets May start for Kavango West 1X production testing

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU backs Namibia’s push for mineral value addition and green industrialisation

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    EU takes N$17.6b of Namibia’s exports in 2025 with uranium, gold anchoring trade flows

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Tsumeb smelter delivers 67,900 tonnes complex copper concentrate in 4th quarter

by Editor
January 9, 2024
in Copper
0
Tsumeb smelter delivers 67,900 tonnes complex copper concentrate in 4th quarter
528
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Dundee Metals says the Tsumeb copper smelter processed approximately 67,900 tonnes of complex concentrate during the fourth quarter, achieving near-record-level performance.
The company says Tsumeb’s improved operating performance reflects the completion of maintenance activities in the off-gas system, undertaken in the third quarter during the Ausmelt furnace shutdown.
According to Dundee, Tsumeb processed about 188,800 tonnes of complex concentrate in 2023, below the annual guidance range due to unplanned downtime and the Ausmelt furnace maintenance, which was extended to complete repairs to the off-gas system, as previously reported.
During the fourth quarter, Dundee repurchased about 1,306,192 common shares at an average price of US$6.21 (C$8.62) per share for approximately US$8.1 million.
In 2023, DPM repurchased 9,738,063 common shares at an average price of US$6.74 (C$ 9.10) per share for a total value of approximately US$65.6 million.
The company plans to release its fourth quarter and full-year 2023 operating and financial results after market close on Wednesday, February 14, 2024.
The company’s other projects, Ada Tepe and Chelopech, also performed well.
Ada Tepe produced a record 35,200 ounces of gold during the fourth quarter, and in 2023, Ada Tepe produced 134,200 ounces of gold, achieving a new record for annual gold production and its annual gold production guidance.
Chelopech produced approximately 41,900 ounces of gold and 8.2 million pounds of copper in the fourth quarter, in line with expectations.
In 2023, Chelopech produced approximately 161,900 ounces of gold and 30.5 million pounds of copper, within its annual guidance for gold and copper production.
In November 2023, Dundee announced a mine life extension to 2032, an optimised life of mine plan, and an updated mineral resource and mineral reserve estimate for the Chelopech mine.
The updated life of mine adds approximately 128,000 ounces of recovered gold and 9 million pounds of recovered copper between 2024 and 2032.
During this period, life of mine gold and copper grades increased by 5% and 3%, respectively, and recoveries for gold increased by 5%.
Dundee CEO David Rae said the company’s mining operations continue to deliver strong results, with Ada Tepe achieving record gold production and Chelopech achieving its annual guidance for gold and copper production.
“We also continued our track record of strong sustainability performance, ranking in the 91st percentile among mining and metals companies in the 2023 S&P Global Corporate Sustainability Assessment for the third consecutive year.”

Share211Tweet132
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

Kaoko Metals begins preparations for maiden drilling at Chalkos and Karibib projects

May 19, 2026
Navachab welcomes 28 apprentices

Navachab welcomes 28 apprentices

May 18, 2026
Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

Kazera flags growing interest in Namibia’s Aftan tantalum-lithium project

May 18, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In