• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, February 11, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    European Investment Bank approves N$40m to fund Uis lithium project feasibility study

    European Investment Bank approves N$40m to fund Uis lithium project feasibility study

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy launches high resolution airborne geophysical survey to map out drilling targets at PEL93

    Andrada unlocks N$190m for Brandberg West development stage

    Andrada intersects lithium grades of up to 3.02% Li₂O at Lithium Ridge

    Eureka Dome – unique rare earths and uranium source

    ReeXploration starts 2,000m drill programme at Eureka

    Craton plans open-pit operation at Omitiomire copper project

    Craton plans open-pit operation at Omitiomire copper project

    Shakwa Nyambe ranked among Africa’s leading energy lawyers

    Legal uncertainty, not geology, threatens Namibia’s oil boom – Nyambe

    BW Energy prepares data room after Kharas-1A confirmed hydrocarbon

    BW Energy prepares data room after Kharas-1A confirmed hydrocarbon

    Irish company Unicorn prepares to acquire 75% in historic Klein Aub Copper Mine by April 2026

    Irish company Unicorn prepares to acquire 75% in historic Klein Aub Copper Mine by April 2026

    Elevate Uranium raises N$312m to accelerate Namibian drilling

    Elevate redefines Marenica with 40.2 Mlb at 185 ppm after data overhaul

    Upstream Petroleum Unit to regulate, license and police oil and gas sector

    Upstream Petroleum Unit to regulate, license and police oil and gas sector

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Uranium prices to drive mining activities in 2024: FNB Namibia

by Editor
November 28, 2023
in Uranium
0
Uranium prices to drive mining activities in 2024: FNB Namibia
557
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

FNB Namibia says uranium prices will be the primary driver of mining activity in Namibia starting in 2024.
Ruusa Nandago says the Langer Heinrich Uranium mine will end the care and maintenance phase in 2024 and target producing 77.4 million pounds over its 17-year life of mine.
Nandago says the Rössing Uranium Mine has extended its life of mine to 2036 and expects to sell 1.4 million pounds of uranium in this current financial year.
According to Nandago, gold will also support, with the Twin Hills Gold Project expecting to produce 169 00 ounces per year over 13 years.
“Lastly, there has been increased exploration activity and interest in Namibia across all minerals, including rare earth elements, base metals, and nuclear fuels, which supports growth in mining,” Nandago said.
The report also points out that favourable mining activity will have spill-over effects on the utilities and transport sectors and will keep gross fixed capital formation growth positive.
“Improved mining activity also supports exports given that minerals dominate Namibia’s exports. However, as the global economy contends with slower economic growth and softening commodity prices, this could dampen export growth,” Nandago says.

Share223Tweet139
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
European Investment Bank approves N$40m to fund Uis lithium project feasibility study

European Investment Bank approves N$40m to fund Uis lithium project feasibility study

February 11, 2026
88 Energy targets 2026 for first exploration well in Owambo basin

88 Energy launches high resolution airborne geophysical survey to map out drilling targets at PEL93

February 10, 2026
Andrada unlocks N$190m for Brandberg West development stage

Andrada intersects lithium grades of up to 3.02% Li₂O at Lithium Ridge

February 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In