• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Monday, August 10, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Union warns workers risk being left behind as mining changes

    Union warns workers risk being left behind as mining changes

    Midas takes 6 months from acquisition to drilling

    Midas hits 35.6m at 3.35% copper at Deblin near Otavi

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Namibia’s next mines depend on today’s exploration – Dr Gabi Schneider

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Kaoko Metals begins maiden drilling at Namibia’s Chalkos copper-silver project

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Sandpiper phosphate project cleared environmentally after decade-long battle

    Appian makes Namibia its biggest global mining investment destination

    Namibia must develop more investment-ready mining projects, says Appian

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Koryx says Haib redesign has strengthened case for about US$1.6 billion development

    Botshiwe urges faster reforms to unlock mining investment

    ECC delays holding back mining investment, Chamber warns

    Government should let business do business, says Swakop Uranium

    Government should let business do business, says Swakop Uranium

    1, 500 working on site at Osino’s Twin Hills ahead of first gold next year

    1, 500 working on site at Osino’s Twin Hills ahead of first gold next year

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Omaheke uranium mining will contaminate aquifer water: Geologist tells Tweya & parliamentary standing committee on natural resources

by Editor
November 19, 2023
in Uranium
0
Omaheke uranium mining will contaminate aquifer water: Geologist tells Tweya & parliamentary standing committee on natural resources
552
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Geologist Dr Roy Miller said Headspring Investments proposed drilling for uranium in the Leonardville area in the Omaheke region could contaminate the underground water.
Dr Miller presented his findings on Friday before a Parliamentary Standing Committee on Natural Resources and Economics and the Stampriet Aquifer Uranium Association members at Leonardville in the Omaheke region.
Headspring Investments, a Namibian registered operating company, is 100% owned by the Russian state-owned Uranium One, which is 100% owned by ROSATOM.
The current area of interest is within a 40km radius of Leonardville, in the Windhoek/Gobabis/Mariental Districts, Khomas, Omaheke and Hardap Regions of eastern Namibia.
Headspring plans to expand its operations for this project and would like to continue to explore the availability of base metals, rare metals, and nuclear fuel minerals at the EPL 4655.
The company wants to extract uranium through in situ recovery (ISR), as open pit and shaft mining are not practical options.
The Stampriet communities are unhappy with the company’s proposed extraction methods, arguing that they will contaminate the underground water.
This led to the formation of the Stampriet Aquifer Uranium Association, whose primary goal is to protect the Stampriet Aquifer Basin.
The association says this aquifer sustains settlements, nourishes farms, and maintains our unique semi-desert ecosystem.
Dr Miller said they are not fighting the proposed development as perceived by many but are questioning the method that could contaminate the underground water.
“The exploration wells go down to 100 to 150m, so it’s the same layer of uranium as the drinking water,” he said, adding that the drinking water is top quality throughout the basin.
Dr Miller has spoken against the in-situ method before.
In August 2022, Dr Miller told the Omaheke governor, Pio Nganate, that the whole area depends entirely on high-quality artesian to subartesian groundwater for survival.
“The water table in the basin is so high that the uranium cannot be mined by conventional open-pit or underground mines. It can only be mined by a process called in-situ leach (ISL) mining,” he adds.
Dr Miller said that a pattern of boreholes is drilled into the orebody during ISL mining, and in the centre of each pattern is a single abstraction borehole.
“The remaining boreholes forming the margin of the pattern are injection boreholes. A leach solution of groundwater and sulphuric acid, similar to battery acid, is pumped down into the orebody,” he said.
Parliamentary Standing Committee on Natural Resources and Economics chairperson Tjekero Tweya said they would study the findings before making a final decision.
“You hear you go and verify the same with us here. The list is factual and scientific,” Tweya said.
He added, “As much as everything appears clear, we still need scientists to verify what we hear, so this is not the end. So, the engagement and the dialogue will continue until we get to the real issue.”

Minister for Agriculture, Water, and Land Reform Calle Schlettwein refused to grant Headspring Investments a permit for uranium mining In December 2022.

Share221Tweet138
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Union warns workers risk being left behind as mining changes

Union warns workers risk being left behind as mining changes

August 10, 2026
Wia grows Kokoseb gold resource 29% to 3.78Moz

Wia grows Kokoseb gold resource 29% to 3.78Moz

August 10, 2026
Wia unveils 1.95Moz Kokoseb reserve for US$475m mine with US$1.2bn NPV

Wia unveils 1.95Moz Kokoseb reserve for US$475m mine with US$1.2bn NPV

August 10, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In