• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, May 13, 2025
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

    Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

    16 mining companies pay N$5,6b in taxes in 2024

    16 mining companies pay N$5,6b in taxes in 2024

    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

    Let’s  turn our stones into bread – Swapo secretary general Shaningwa

    Let’s turn our stones into bread – Swapo secretary general Shaningwa

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Uranium mines in Erongo face a 500 cubic meter per hour water deficit

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Supernova moves to increase interest in Block 2712A by acquiring 36% interest in WestOil

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Consolidated Copper’s restart of Central Operations based on 10-year mine plan

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Connected Minerals Limited to explore three zones at its Etango North-East uranium project

    Ongombo copper-gold project’s ESIA at an advanced stage

    Ongombo copper-gold project’s ESIA at an advanced stage

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Elevate Uranium expands mineralisation at Namib IV at the Koppies Project

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Transport

The 1 500km TransKalahari Railway Project coming to life 9 years later

... deal signed in March 2014

by Editor
November 16, 2023
in Transport
0
The 1 500km TransKalahari Railway Project coming to life 9 years later
645
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

The plan to connect Namibia to Botswana by rail is becoming real after the Trans-Kalahari Railway Project Management Office’s call for expression of interest attracted 12 bids.
Dubbed the Maputo-Walvis Bay Corridor, the project involves rehabilitating the TransNamib line from Gobabis via the capital, Windhoek, to serve the new port at Walvis Bay.
Besides expanding freight capacity within the Sadc, the TransKalahari project will provide access to global markets for Malawi, Zambia and Zimbabwe.
The TransKalahari Railway will transport fuel, iron ore, copper, and coal to and from overseas markets.
Botswana and Namibia signed the agreement to build the Trans-Kalahari Railway (TKR), a 1500km heavy-haul line linking Botswana’s coalfields with the existing railhead at Gobabis in March 2014.
The estimated construction costs were N$100bn ($S$9.2bn).
The then National Planning Commission director general Tom Alweendo and Botswana’s minister of minerals, energy and water Onkokame Kitso Mokaila signed the agreement at Walvis Bay.
Seven foreign companies – NGE Contracting from France, Egypt’s Orascom Construction, China Civil Engineering Construction Corporation, Lesedi Nehawu Investment JV from South Africa, Rail Vikas Nigam Limited from India, Trans-Kalahari Railway Initiative Consortium – a Namibia-South Africa collaboration, Nations Capital Projects PTY (LTD) and Seven Five Investments CC, both from South Africa – want in on the project.
Helo Group, West Coast Energy, Fullbright Investment, Grindrod and Mega North Holdings are local companies that submitted bids.
The TransKalahari Railway Project wants suitable partners to fund and develop or upgrade the existing rail infrastructure and construct a new 1,500-kilometre line between Botswana and Namibia.
The winning bidder will construct loading facilities at Mmamabula in Botswana, build the railway line and upgrade existing railway infrastructure from Mmamabula to Walvis Bay in Namibia.
TransNamib acting CEO Webster Gonzo told Zawya Projects last month that if the rail connects to Botswana, it will be easy to connect to South Africa and further northwards to the African hinterland.
Gonzo added that this fertile agricultural land can be a ready market for the green ammonia produced in Namibia.

 

Share258Tweet161
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
2023 BROKE 95-YEAR WAIT FOR OIL

Orange Basin’s Mopane-1X well shows signs of hydrocarbons

2
Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

Kodo to drill Noronex’s Fiesta prospect on Kalahari Copper Belt

May 13, 2025
16 mining companies pay N$5,6b in taxes in 2024

16 mining companies pay N$5,6b in taxes in 2024

May 13, 2025
Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

Namcor and Sonangol need to continue working together – Nandi-Ndaitwah

May 12, 2025
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe