• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, April 25, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Rhino drills appraisal well to test Capricornus oil extension

    Rhino drills appraisal well to test Capricornus oil extension

    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Copper

Kombat Mine to restart in 2026 as construction begins on historic copper asset

by Editor
February 18, 2026
in Copper
0
Kombat Mine to restart in 2026 as construction begins on historic copper asset
598
SHARES
1.7k
VIEWS
Share on FacebookShare on Twitter

Kombat Mine is set to resume operations in the fourth quarter of 2026 after construction officially began this month, marking the latest chapter in the revival of one of Namibia’s most historically significant copper operations.

A construction commencement ceremony held on 6 February 2026 formally signalled the restart of development activities at the mine, now operated by New Horizon Copper (Pty.) Ltd. and backed by majority shareholder Horizon Corporation Ltd.

The event was attended by senior leadership from both companies, Namibian government representatives and local community stakeholders, highlighting the national and regional importance of the restart.

Kombat is a high-grade, volcanogenic massive sulphide copper system with a long production history dating back to the 1960s.

Over several decades, the mine produced copper, along with by-products of lead, silver and gold, before repeated shutdowns linked to ownership changes, funding constraints and operational disruptions.

The deposit is characterised by multiple mineralised lenses, including the Asis West, Kombat and Gross Otavi zones, which have historically supported underground mining.

The mine hosts a substantial remaining resource base, defined by high-grade copper mineralisation that underpins the current restart strategy.

New Horizon Copper has previously indicated that existing resources, combined with significant exploration upside along strike and at depth, provide a foundation for a staged restart and future expansion as capital and development work progress.

Under the current plan, Kombat will be developed in phases, with throughput ultimately expected to double historical levels to 60,000 tonnes of ore per month.

Initial work is focused on safely reopening and expanding underground mining areas around the Asis West Shaft, supported by upgrades to processing infrastructure.

These include the planned installation of sensor-based ore-sorting technology to improve feed grades, reduce waste, and enhance overall processing efficiency.

New Horizon Copper chief executive officer Rennie Morkel said the start of construction marked a decisive break from the mine’s stop-start past.

“This represents a break from the past, as we now rebuild together for the future. We are confident that this substantial investment into Namibian mining, together with a renewed operational approach, will bring much-needed stability to this operation,” Morkel said.

Horizon Corporation co-chief executive officer Darius Ghesmati said the Kombat restart followed more than a year of negotiations and restructuring.

“The reopening of Kombat Mine illustrates our belief in Namibia as an investment opportunity and in a team that will re-establish this mine as a world-class copper producer,” he said.

Horizon has committed more than US$24 million, equivalent to about N$390 million, in equity funding to restart and expand the operation.

Of this, US$4.5 million has already been deployed during the temporary closure phase to fund care-and-maintenance activities, dewatering, and early works required before construction.

New Horizon Copper said early progress includes more than 31,000 lost-time-injury-free shifts, the implementation of a comprehensive dewatering strategy to access underground workings, and the commencement of key civil works.

These milestones are intended to de-risk the restart and support a transition into sustained production.

Founding shareholder and director Knowledge Katti said the revival of Kombat carried deep socio-economic significance for surrounding communities and the wider Otjozondjupa Region.

He highlighted the creation of skilled jobs and opportunities for youth, as well as the potential to address long-standing infrastructure and housing challenges in the area.

Katti also pointed to the role of Epangelo Mining, which holds a 10% interest in the mine, as a mechanism for state participation and local benefit.

Located in central-north Namibia, Kombat Mine is owned 80% by New Horizon Copper, with the remaining 20% held by Namibian partners.

At steady state, the operation is expected to produce saleable copper concentrate from up to 60,000 tonnes of ore per month, positioning Kombat as a key contributor to Namibia’s renewed copper production pipeline.

Share239Tweet150
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Rhino drills appraisal well to test Capricornus oil extension

Rhino drills appraisal well to test Capricornus oil extension

April 24, 2026
Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

Hebei Construction takes Kazera Global to high court over US$11.9m tantalum mine dispute

April 24, 2026
Askari Metals keeps reduced team at Uis project for low-cost but high impact

Askari Metals reports high-grade tin, lithium and tantalum assays at Uis

April 24, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In