• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, April 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Prospect Resources ‘forgotten’ lithium project

    Prospect Resources seeks partners for Omaruru lithium project after exploration halt

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

    Nyambe first African to be appointed international energy negotiators president-elect

    SNC advised BP to acquire 60% operating interest in PELs 97, 99 and 100 in Walvis Basin

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Paladin books US$47.3m Langer Heinrich sales, leans on market deals to meet deliveries

    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Construction

RCC denies asset removal at Oshakati–Ompundja construction site

by Editor
January 14, 2026
in Construction
0
RCC denies asset removal at Oshakati–Ompundja construction site
514
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

The Roads Contractor Company (RCC) has moved to dispel speculation circulating on social media over the Oshakati–Ompundja road project, saying no equipment or property has been removed from the construction site.

In a statement, RCC said it had taken note of a video shared on social media platforms in Oshiwambo that refers to items allegedly removed from the Oshakati–Ompundja construction camp and raises concerns about possible asset removals.

RCC clarified that all equipment assigned to the project remains in place and that there has been no incident involving the removal of company assets from the site.

The company said it was issuing the clarification to prevent misunderstanding and speculation that could be wrongly linked to the project.

Although the video does not explicitly identify RCC equipment, the company said it considered it necessary to address the matter proactively in the interest of transparency and responsible communication.

RCC urged members of the public to verify information through official channels and cautioned against sharing content that may be misleading or taken out of context, warning that such material could create unnecessary concern within communities and among project stakeholders.

The company reaffirmed its commitment to transparency and said it would continue to engage the public through its official communication platforms as work on the Oshakati–Ompundja road project continues.

The Oshakati–Ompundja road project forms part of the Namibian government’s broader programme to upgrade rural and regional road infrastructure in the Oshana Region, where traffic volumes and population growth have placed sustained pressure on existing gravel roads.

The route links Oshakati, the region’s leading commercial and administrative centre, with Ompundja and surrounding constituencies that depend on the corridor for daily commuting, access to schools, health services and local markets.

The project was officially launched in November 2025 by the Minister of Works and Transport, Veikko Nekundi, marking the start of construction on the first phase of the upgrade.

That initial phase covers approximately 12 kilometres of the road and is being upgraded to a low-volume sealed standard, a design intended to improve road safety, reduce dust and lower long-term maintenance costs on busy rural routes.

The first phase of the project carries an estimated cost of about N$28.9 million, funded through government allocations administered by the Roads Authority.

The full Oshakati–Ompundja corridor extends for more than 40 kilometres, with further phases expected to follow as funding becomes available.

The RCC, a state-owned enterprise responsible for the construction and rehabilitation of Namibia’s road network, was appointed to implement the works under the supervision of the Roads Authority.

In line with government infrastructure policy, the project includes local economic participation, with a portion of the works allocated to small and medium-sized enterprise subcontractors and employment opportunities created for workers from surrounding communities.

The upgrade follows long-standing concerns over the condition of the existing road, which has deteriorated due to traffic loads, weather impacts and limited maintenance, particularly during the rainy season.

Once completed, the Oshakati–Ompundja road is expected to improve travel times, enhance safety and strengthen connectivity between rural settlements and Oshakati’s economic hub, supporting broader regional development in northern Namibia.

*Photo credit: New Era

Share206Tweet129
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Prospect Resources ‘forgotten’ lithium project

Prospect Resources seeks partners for Omaruru lithium project after exploration halt

April 23, 2026
Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

Deep Yellow drills 133 holes at Tinkas, confirms uranium mineralisation

April 23, 2026
Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

Skeleton Coast Uranium appoints South African firm Practara to fast-track Namibia resource reports

April 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In