• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Tuesday, April 21, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

    Multi-project oil province forms as FID timelines align for 2026–2027

    Monitor launches airborne geophysical survey over PEL 93 as drilling phase comes into view

    Monitor confirms drill-ready Lead 9 prospect at PEL 93 in Etosha basin

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Azule Energy appoints Aquilina as Namibian operations country manager, announces setting up local offices

    Noronex starts spectrometry survey at Etango North Uranium Project for follow-up exploration

    Noronex drills Etango North, builds A$2m war chest as uranium, copper push intensifies

    88 Energy targets 2026 for first exploration well in Owambo basin

    88 Energy completes PEL 93 survey, targets well identification as Kavango testing unfolds

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Ongwe Minerals starts trading on the Namibia Securities Exchange

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    Chevron targets 2026 Nabba-1X well in PEL 90 in Orange Basin

    ReconAfrica starts civil works ahead of drilling Naingopo well in the Kavango Basin

    ReconAfrica targets June completion for Kavango well testing

    When it comes to uranium, Namib Desert does not disappoint

    Elevate grows Koppies uranium resource from 66.1Mlb to 76.2Mlb after Namib IV discovery

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Green Hydrogen

Zhero Europe pledges US$5.15m for Zhero Molecules plant to produce 500,000t of molecules, create 500 jobs

by Editor
December 21, 2025
in Green Hydrogen
0
Zhero Europe pledges US$5.15m for Zhero Molecules plant to produce 500,000t of molecules, create  500 jobs
519
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

An initial US$5.15 million, about N$95 million, has been committed to advance what could become a multi-billion-dollar green ammonia project near Walvis Bay, as SDG Namibia One Fund signed a Development Funding Agreement with clean energy developer Zhero Europe.

The funding will support early-stage development and feasibility work for the Zhero Molecules Walvis Bay Project, an industrial-scale green ammonia facility planned for Namibia’s central coast in the Erongo Region.

The development capital is intended to take the project through detailed studies and permitting ahead of a targeted final investment decision in 2027, with commercial operations expected by 2030.

SDG Namibia One Fund, also known as Climate Investor Three Namibia, is managed by Climate Fund Managers in partnership with Dutch development finance institution Invest International and the Environmental Investment Fund of Namibia.

The fund is backed by the European Union’s Global Gateway investment strategy and Invest International, and focuses on mobilising blended finance into Namibia’s energy transition and green hydrogen sectors.

Zhero Molecules Walvis Bay is Zhero’s flagship green molecules project and is designed to produce 500,000 tonnes of green ammonia per year once operational, avoiding an estimated 1.2 million tonnes of carbon dioxide emissions annually.

The product is intended for global decarbonisation markets including fertilisers, maritime fuels and industrial feedstocks.

The project is expected to be powered by an integrated renewable energy system comprising 3 GW of solar photovoltaic capacity, 2.2 GWh of battery energy storage, a 1.6 GW electrolyser system and approximately 110 kilometres of new transmission infrastructure.

A desalination plant is planned to supply water for hydrogen production.

Zhero estimates that construction could create around 6,000 jobs, with approximately 500 permanent positions during operations, alongside opportunities for local suppliers and service providers.

Darron Johnson, Regional Head of Africa at Climate Fund Managers, said the funding is intended to de-risk the project and unlock larger pools of private capital.

He said the blended finance structure is designed to prepare the project for financial close and attract private investment at scale.

Zhero Chief Operating Officer Paolo Gallieri said the funding strengthens the company’s ability to deliver a world-class green ammonia facility aligned with Namibia’s national vision.

While the US$5.15 million announced covers only development work, projects of this scale typically require several billion US dollars in construction finance, positioning Zhero Molecules Walvis Bay as a potential landmark investment in Namibia’s emerging green hydrogen economy.

Share208Tweet130
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Northern Graphite plans Okanjande mine restart in 2027

Northern Graphite plans Okanjande mine restart in 2027

April 21, 2026
Oregen Energy moves to lay stake in Block 2812Ab, Orange Basin

Multi-project oil province forms as FID timelines align for 2026–2027

April 20, 2026
Hardwire oil wealth into law to avoid missed opportunity — McLeod

Hardwire oil wealth into law to avoid missed opportunity — McLeod

April 20, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In