• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, June 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    MUN embarks on nationwide engagement with workers

    MUN embarks on nationwide engagement with workers

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Serval targets first drilling at Omatapati copper-silver prospect in Kaoko Basin

    Eco Atlantic says Orange Basin oil discoveries open farm-out opportunities for its Walvis Basin blocks

    Eco Atlantic prepares major offshore exploration campaign across three Walvis Basin licences

    Aune Amutenya appointed acting petroleum commissioner

    Aune Amutenya appointed acting petroleum commissioner

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Kaoko fast-tracks Chalkos Copper Project drilling after executives visit Namibia

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Canadian company Vatic enters Namibia by targeting Zoya and Galore projects near Swakop

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    Heavyweight syndicate backs Ongwe’s C$23m Namibia gold push

    African Pioneer seeks to raise £420,000 for Ongombo copper-gold project

    Hong Kong-based Chinese mining group Xinhai to fund Ongombo-Ongeama copper projects

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Former Deep Yellow boss John Borshoff joins Forsys Metals

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Midas intercepts 51m at 2.18% CuEq at Otavi, says 7th rig coming end of June

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Lithium

Andrada commissions pilot plant at Uis, eyes producing 250t per month Q1 of 2024

by Editor
November 27, 2023
in Lithium
0
Andrada commissions pilot plant at Uis, eyes producing 250t per month Q1 of 2024
562
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Andrada Mining has successfully commissioned its pilot plant at Uis Mine in Namibia’s Erongo region, producing 10 tonnes of saleable lithium concentrate on specification.
The company plans to ramp up production by up to 250 tonnes per month during the first quarter of 2024.
The pilot plant commissioner on 26 July 2019 consists of two main parts: a four-stage crushing circuit and a three-stage concentrating circuit.
Andrada completed the hot commissioning of the crushing circuit in June 2019 and the cold commissioning of the concentrating circuit, which includes water testing of the wet circuits, on 28 July 2019.
Hot commissioning is when the plant processes are placed in conjunction with the control systems, while cold commissioning involves inspections and verifications on the central systems both in the phase before switching on.
Andrada says the initial objective of the pilot plant is to produce sufficient bulk samples of petalite concentrate within specifications for the premium specialist glass and ceramics markets.
According to the company, the pilot plant should produce concentrate for metallurgical testwork to determine appropriate specifications for the lithium battery refinery market.
Andrada intends to produce a concentrate for initial commercial sales into the spot market by the end of February 2024.
The company’s CEO, Anthony Viljoen, says their efforts in 2023 could place Andrada at the forefront of lithium development in Africa.
Viljoen says the discovery of additional lithium within the company’s Lithium Ridge and Spodumene Hill also underscores the possibility that Namibia’s Erongo region could be a key participant in the global lithium landscape, potentially hosting a cluster of significant mines.
“The early results from the recently commissioned lithium processing pilot facility have instilled unwavering optimism,” Viljoen says.
He adds that Andrada is negotiating with lithium off-takers who target the company’s involvement in all downstream lithium markets.
“Overall, we consider the pilot plant to serve as a crucial de-risking element in the Company’s lithium portfolio, further bolstering our confidence in Andrada’s lithium strategy,” Viljoen says.

Share225Tweet141
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Tower Resources invited to enter first renewal period of PEL 96 in Walvis Basin

Tower Resources waits on final Namibia approval as Prime Global farm-out nears completion

June 24, 2026
Cazaly Resources starts drilling at Kaoko lithium project

Cazaly secures access to Cadix farm area, targets 3Q 2026 for maiden drilling at Abenab North

June 23, 2026
Tantalite Valley waiting for exploitation

Kazera agrees US$10.5m deal to end Aftan payment dispute

June 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In