• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Saturday, May 2, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Pioneer prepares next exploration phase at Warmbad Uranium Project

by Editor
November 3, 2025
in Magazine
0
Pioneer Lithium acquires Warmbad Uranium Project in //Kharas from Rodon Metals
505
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Pioneer Lithium is setting the stage for a new round of exploration at its Warmbad Project — a 271 km² licence area (EPL 8838) located within the Namaqua Metamorphic Complex. The company has begun finalising land access and stakeholder engagement in preparation for detailed airborne radiometric and magnetic surveys — key groundwork for the project’s next drilling phase.

Warmbad was last surveyed in 2007, long before uranium mineralisation was discovered in the area. The old dataset, broad in scale and of limited resolution, no longer meets the technical needs of modern exploration.

Pioneer’s upcoming survey will deliver high-resolution magnetic and radiometric coverage, enabling the company to refine its geological model and identify untested targets.

Magnetite has been observed within the uranium-bearing alaskite host rocks, and a clear relationship between the two was noted in geological logging.

However, this association was never fully defined or pursued. By re-examining these magnetic highs, Pioneer aims to pinpoint zones of potentially higher-grade uranium mineralisation across both known and unexplored areas.

Once the geophysics are complete, Pioneer plans to launch an extensive drilling programme combining resource confirmation, step-out exploration, and structural analysis.

Resource drilling will be conducted across all three of the project’s known mineralised zones — Areas 1, 3 and 5 — to validate historical intercepts and generate data sufficient for a JORC 2012-compliant resource estimate.

Diamond drilling will be used to obtain samples for metallurgical testing and to define better structural controls, particularly along the fold hinges and northeast-trending faults that host mineralisation.

Exploration drilling will expand on open zones within the existing prospects and test several new targets, including the nose of the fold hinge at Area 1 and the northeast-trending fault that connects Areas 3 and 5.

Pioneer’s geologists believe these fault systems were instrumental in the emplacement of mineralised alaskite bodies — yet surprisingly little historical work was ever done to test them directly.

The Warmbad deposit sits in a geological setting similar to that of Namibia’s Rossing Mine, with uranium mineralisation occurring in leucocratic alaskitic intrusions controlled by structural deformation.

Historical drilling by Xemplar Energy Corp between 2007 and 2009 — comprising 161 reverse-circulation and 11 diamond holes totalling 31,685 metres — delineated three continuous mineralised zones.

At Area 5, drillholes recorded cumulative uranium contents of up to 1% cumulative grade-thickness U₃O₈, with mineralised intervals exceeding 50 metres downhole.

Following its acquisition of Warmbad in 2025, Pioneer confirmed the presence of extensive historical data and announced an initial Exploration Target of 22.2 – 32.1 million tonnes grading 100 – 120 ppm U₃O₈.

With land access agreements now secured and discussions ongoing with the Ministry of Mines and Energy and the Resettlement Committee, Pioneer expects to commence the high-resolution magnetic and radiometric surveys before year-end.

Results from these surveys will guide the 2025 drilling campaign, which will focus on step-out holes at Areas 1, 3 and 5, including the Area 3 extension zone where mineralisation remains open.

The company’s stated goal is to convert the known uranium zones at Warmbad into a JORC-compliant resource and to test new fault-controlled targets that could significantly expand the project’s scale.

Warmbad’s potential lies in its structural complexity and the untapped mineralisation concealed within its granite-hosted system.

The next round of geophysics and drilling represents not only a technical milestone but the start of a broader plan to reposition the project as one of southern Namibia’s emerging uranium assets.

Share202Tweet126
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In