• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, August 20, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Amutse says Namibia must be ready onshore before first oil flows offshore

    Amutse says Namibia must be ready onshore before first oil flows offshore

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

    First oil cannot be Namibia’s destination – Shilunga

    First oil cannot be Namibia’s destination – Shilunga

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    VSA Capital CEO Andrew Monk tours Namibia’s mining projects

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Equinor takes 17.4% stake in Chevron’s PEL 90

    Skeleton Coast Uranium closes N$95m funding, completes Namibia licence deal

    Skeleton Coast identifies first uranium targets across three Erongo licences

    Bannerman targets over 80% Namibian workforce at Etango

    Bannerman targets over 80% Namibian workforce at Etango

    ReconAfrica moves Kavango West discovery towards appraisal well

    ReconAfrica moves Kavango West discovery towards appraisal well

    Midas kicks off major drill campaign at Otavi Copper Project

    Midas hits 41m at 1.13% copper as Spaatzu extends to 1.2km

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Quantum Leap Energy plans nuclear fuel processing pilot plant at Walvis Bay

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Langer Heinrich’s remarkable return 

by Editor
October 15, 2025
in Magazine
0
Langer Heinrich’s remarkable return 
613
SHARES
1.8k
VIEWS
Share on FacebookShare on Twitter

Langer Heinrich Mine has produced about 4.60 million pounds of uranium oxide (U₃O₈) in seven quarters since it restarted operations in 2024.

Each quarter has shown a gradual rise in output, culminating in the September 2025 quarter, when the mine delivered its highest production since resumption—1,066,496 pounds of U₃O₈.

In the June 2025 quarter, Langer Heinrich produced 993,843 pounds, following 745,484 pounds in the March 2025 quarter.

Since March 2024, the mine’s production has increased as operations stabilised. Output to 30 June 2024 totalled 517,597 pounds during the initial restart phase, followed by 639,679 pounds in the September 2024 quarter, 638,409 pounds in December 2024, 745,484 pounds in March 2025, 993,843 pounds in June 2025, and 1,066,496 pounds in September 2025.

The steady rise confirms a full operational recovery and stable ramp-up after six years of suspension.

Langer Heinrich is located about 80 kilometres east of Swakopmund in the Erongo Region.

It is a calcrete-hosted uranium deposit mined by open-pit methods, with ore treated through an alkaline leach and ion-exchange circuit to produce uranium oxide concentrate for export.

History and background

The uranium deposit at Langer Heinrich was discovered in 1973. Paladin Energy acquired the project in 2002 and advanced it to construction and commissioning, with first production achieved in early 2007 and the official opening on 15 March 2007.

The operation expanded in stages over the next five years, lifting nameplate capacity from an initial ~2.6–2.7 million pounds per year to above 5 million pounds per year by 2012. Before suspension, Langer Heinrich produced more than 43 million pounds of U₃O₈ in total, making it one of Namibia’s most significant uranium producers alongside Rössing and, later, Husab.

Care and maintenance, and restart

In 2018, following a prolonged decline in uranium prices, Paladin placed the mine on care and maintenance.

A restart programme was approved in 2022 to refurbish processing facilities, upgrade utilities, and re-establish the workforce.

First ore was introduced to the plant in January 2024, and commercial production and drumming resumed in March 2024.

Paladin holds 75 per cent of the operation, and CNNC Overseas Uranium Holding holds 25 per cent.

Investments

The 2022 restart plan carried an estimated capital outlay of about USD 118 million, directed at plant refurbishment, equipment replacements, reliability upgrades in the leach and ion-exchange circuits, and improvements to power and water systems.

Post-restart, further sustaining and optimisation capital has focused on pit development, materials handling, reagent management, and debottlenecking to support the ramp-up.

Earlier in the mine’s life, multi-stage expansions were completed to increase capacity; those programs added processing units and throughput, but are not detailed here by value.

Recent operations and outlook

Post-restart, production has ramped steadily. Sales in the September 2025 quarter were lower than output—about 533,000 pounds—due to shipping delays at Walvis Bay; the undelivered material remains under contract for subsequent quarters.

Paladin expects output to continue rising as pit development advances and process optimisation continues.

The mine is targeting an annualised rate of about six million pounds of U₃O₈ by 2026, subject to operating performance and market conditions, with stable power and water supply arrangements in place to support ongoing operations.

Share245Tweet153
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

OPINION – Namibia’s oil & gas conference economy grows years before first drop oil

August 20, 2026
Amutse says Namibia must be ready onshore before first oil flows offshore

Amutse says Namibia must be ready onshore before first oil flows offshore

August 19, 2026
Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

Namibia demands reciprocal commitment as oil industry moves towards production – Witbooi

August 19, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In