• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Wednesday, June 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Tower Resources bets big on Walvis Basin potential

    Tower Resources raises £1.87m through 2 share subscriptions

    Nasan Energies takes over divested Engen and Shell service stations

    Nasan Energies takes over divested Engen and Shell service stations

    TotalEnergies buys 19,89% combined interest in Impact Oil’s Blocks 2912 and 2913B in Orange Basin

    Impact sheds South African assets to focus on Namibia’s Venus project

    Kaoko Metals launches IPO to fund copper exploration in northern Namibia

    Namibia turning explorers into market winners, says FitzGerald

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Sintana raises US$11.5m for Namibia offshore drilling campaign

    Namibia’s next multi-mineral growth province

    Celsius Resources targets June deal for Opuwo Cobalt-Copper project sale

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    C29 Metals strikes N$56m deal for Otavi copper, two Damara gold projects

    Midas Minerals prepares to transition copper assets to full scale drilling

    Midas sells Australian project to invest in Otavi Copper-Gold Project

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    General Copper Gold Corp raises about N$21m for Namibia, British Columbia projects

    Kavango West-1X

    ReconAfrica secures permits for Kavango West oil flow testing in Namibia

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Bannerman moves Etango toward reality

by Editor
September 10, 2025
in Magazine
0
Bannerman Energy to spend N$1.6b (A$140m) to progress Etango Project towards FID
509
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Etango has been on Namibia’s mining horizon for decades, but the project is now edging closer to reality.

According to the Ecofin Agency, Bannerman Energy will make its Final Investment Decision on the project in late 2025, after postponements in 2023 and 2024.
That decision will unlock the capital needed to build a mine expected to produce 3.5 million pounds of uranium a year across a 15-year life span, backed by a 2022 feasibility study that estimated initial costs at 317 million US dollars.
The story of Etango is one of patience. First discovered during the uranium exploration boom of the 1970s and 1980s, the deposit was acquired by Bannerman in 2005. Years of drilling and study led to feasibility work in 2012 and again in 2022, confirming Etango’s viability as a conventional open-pit mine with heap leach processing.
Unlike many projects that linger in the pipeline, Etango already holds both a mining licence and environmental approvals, setting it apart as a development-ready uranium project.
Momentum has picked up in 2025. In early September, Bannerman signed its first uranium supply agreements with two major North American utilities.
The contracts cover one million pounds of uranium to be delivered between 2029 and 2033 under flexible, inflation-linked pricing terms.
These agreements not only demonstrate Etango’s ability to secure customers but also provide crucial validation for financiers weighing investment in the project.
The timing is auspicious.
Uranium demand is surging as more countries turn to nuclear power to achieve energy security and carbon neutrality.
Prices have strengthened, and analysts see Etango as one of the few large-scale, fully permitted uranium projects capable of meeting the coming supply crunch. By delaying the investment decision in 2023 and 2024, Bannerman positioned itself to step forward at the right moment.
For Namibia, Etango carries national significance. Situated in the Erongo Region, about 30 kilometres southeast of Swakopmund, it will join the country’s established uranium cluster of Rössing, Husab, and Langer Heinrich.
Its development promises jobs, procurement opportunities, and fiscal revenues, while contributing to the government’s NDP6 goals of deepening mining’s role in economic growth.
For Bannerman, the wait is nearly over. With offtake agreements in place, financing preparations advancing, and the Final Investment Decision set for late 2025, Etango is poised to move from a project on paper to a mine under construction.
After decades of exploration and study, Namibia’s uranium province is preparing to welcome a new player on the global stage.
Share204Tweet127
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Tower Resources bets big on Walvis Basin potential

Tower Resources raises £1.87m through 2 share subscriptions

June 3, 2026
Wia Gold plans 177,000-ounce annual production as Kokoseb Gold Project

Wia Gold plans 177,000-ounce annual production as Kokoseb Gold Project

June 3, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande plant relocation 60% complete as Northern targets 2027 mine restart

June 2, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In