• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Sunday, May 3, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

    Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

    Pancontinental opens PEL 87 virtual data room to bidders

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Mining pays Namibia N$7.8 billion as corporate tax jumps 55%

    Chamber of Mines to engage Govt after Namibia shed 3 points in Fraser Institute mining survey

    Namibia can unlock 18 000 mining jobs and billions if policy bottlenecks are cleared – Malango

    Uis Tin Mine: The world’s largest undeveloped open-cast hard rock tin deposit

    Andrada delays £7.7m loan repayment to fund Uis mine expansion

    Connected Minerals completes maiden RC drilling at Etango North-East, moves rig to Swakopmund Uranium Project

    Connected pauses work on its Namibian uranium assets as cash falls to A$2.8m

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Bannerman targets Etango FID after mid-2026 Chinese-backed deal completion

    Midas defines 211kt copper equivalent resource at Otavi, outlines open-pit potential

    Midas declares maiden 10.5Mt at 1.6% copper and 21g/t silver resource at Otavi projects

    Public review opens for Koppies West uranium project application

    Elevate grows Namibian uranium footprint to 116 million pounds

    Galp’s long game: From HRT’s early dry wells to Namibia’s new oil dawn

    Galp confirms three-well drilling and testing campaign for Mopane

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Experts chart the investor roadmap – what does it mean to turn EPL into a mine?

by Editor
August 16, 2025
in Magazine
0
Experts chart the investor roadmap – what does it mean to turn EPL into a mine?
535
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Namibia’s mining industry may be on a growth trajectory, but for many Exclusive Prospecting Licence (EPL) holders, turning a licence into a producing mine remains a steep climb.

A high-level panel at the just-ended mining expo in Windhoek unpacked the common stumbling blocks and offered clear, practical advice on attracting serious investors.

Moderated by Dr. Andrea Salomo, Senior Investment Analyst for Mining at the Namibia Investment Promotion and Development Board (NIPDB), the discussion at the mining expo 2025 brought together expertise spanning geology, finance, environmental governance, and investment promotion.

Panellists included Justine Shipanga, Senior Manager for Investor Services at NIPDB; exploration entrepreneur Heye Daun; Dr. Godknows Njowa, Council Member of the Southern African Institute of Mining and Metallurgy (SAIMM); ESG specialist Jessica Bezuidenhout; and lawyer and financier Zach Kauraisa, Head of Advisory at EOS Capital.

From Paper to Project

Asked how an EPL holder can attract equity funding, Daun’s advice was blunt: an EPL on its own has little inherent value.

“It’s what you do with it that matters,” he said. This starts with investing in exploration — drilling, sampling, and building geological knowledge. Only then can the project be positioned for investor interest.

Dr. Njowa explained that “strong geological data” can be built up even on a limited budget.

He urged licence holders to start with historical Geological Survey records to understand past work and market conditions, then add new data step by step to create a compelling investment case.

ESG: Not an Afterthought

From an environmental, social, and governance (ESG) perspective, Bezuidenhout identified two recurring weaknesses that discourage investors: a lack of regulatory clarity and a fragmented approach to ESG. She argued for collaborative ESG efforts among EPL holders, utilising established platforms such as the Chamber of Mines or the Namibian Chamber of Environment to pool resources and standardise practices.

Jessica also urged early action on community relations. Obtaining an Environmental Clearance Certificate and engaging stakeholders from the outset builds a “social licence to operate,” which, she warned, is intangible but essential to long-term project stability.

Investor-ready starts with paperwork

From the NIPDB’s vantage point, Shipanga said that many promising projects fail to attract capital because their basics are incomplete: there are no pitch materials, no exploration summary, unclear shareholding, and, in some cases, joint venture agreements lacking ministerial approval under Section 31B of the Minerals Act. Without these fundamentals, she said, “serious funders won’t engage.”

Kauraisa agreed, emphasising the need for a comprehensive documentation package — including geological reports, financial statements, and proof of legal compliance — supported by a multidisciplinary team encompassing technical, legal, environmental, and economic disciplines.

Financing beyond equity

On innovative financing, Kauraisa pointed to global instruments such as streaming, royalty agreements, and off-taker prepayments.

He suggested Namibia could consider creating a state-backed exploration fund, reinvesting part of mining tax revenue to de-risk greenfield exploration and build a pipeline of future mines.

Daun noted that in production phases, sharing ownership is straightforward, but in exploration, the high risk means earn-in structures — where an investor builds their stake over time — often work best while ensuring local partners retain meaningful equity.

For Dr. Njowa, mentoring is a cost-effective way to raise the quality of project reporting.

“Sometimes 30 minutes with an experienced operator can save months of misdirected effort,” he said, calling for more industry professionals to offer guidance to license holders.

Closing messages

Daun reminded the audience that Namibia’s stable regulatory framework is one of its greatest assets and must be protected to maintain a steady flow of foreign capital. Dr. Njowa warned that protracted ownership debates erode value.

Shipanga reiterated that EPL holders should leverage existing support structures, while Kauraisa encouraged an understanding of the Lassonde Curve, which shows investors exactly how their capital will add value at each project stage.

The discussion underscored a shared truth: an EPL may be the starting point, but it is disciplined exploration, strong governance, transparent ESG, and investor-ready preparation that ultimately determine whether a licence becomes a mine.

Share214Tweet134
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

Sintana says Namibia drives growth as Mopane rises to 1.38bn boe

April 30, 2026
Northern Graphite plans restarting Okanjande in 2027

Okanjande moves closer to restart after Northern clears US$22m debt burden

April 30, 2026
Namibia’s PEL 87 comes of age as one of most technically advanced pre-drill plays

Pancontinental opens PEL 87 virtual data room to bidders

April 30, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In