• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Friday, October 23, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Bannerman approves FID for Etango, targets 2028 for yellow cake

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Paladin spends US$11m building uranium stockpiles at Langer Heinrich

    Safi Silver receives third US$3m payment from Kombat mine sale

    Namibia targets 57% processed mineral exports by 2030

    Petroleum Bill passes second reading with 50 votes

    Midas clears key hurdle in Otavi copper project acquisition

    Canadian firm targets 93,801 hectares in Namibia’s Otjozondjupa Region

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    African Pioneer deploys first rig to confirm 3–4 years of open-pit mining at Ongombo

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Aldoro drills for copper-gold targets at Avondschaduw prospect near Kalkfeld

    Diamond industry faces familiar slump, but recovery may be different this time

    Diamond industry faces familiar slump, but recovery may be different this time

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    African Pioneer begins 7,000m drilling at Ongombo and Ongeama copper projects

    Deep Yellow locks in water, local ownership ahead of Tumas investment decision

    Deep Yellow postpones Tumas investment decision beyond 2026

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home Magazine

Bannerman infrastructure to accommodate 20 million tonnes, sets production by 2028

by Editor
August 13, 2025
in Magazine
0
Bannerman infrastructure to accommodate 20 million tonnes, sets production by 2028
566
SHARES
1.6k
VIEWS
Share on FacebookShare on Twitter

Bannerman Mining Resources Namibia, led by Managing Director Werner Ewald, is developing an initial processing plant capable of handling eight million tonnes of ore annually at its Etango-8 uranium project.

The facility’s infrastructure is being built to accommodate future expansion to Etango-20, which would double the capacity to 20 million tonnes per year.

Construction is expected to be completed by the end of 2027, with first uranium production scheduled for 2028.

Ewald outlined these developments during a presentation at the 2025 Mining Expo, describing Etango-8 as a transformative project for Namibia’s uranium sector.

He emphasised that all funding to date has come from international investors who have confidence in both Namibia and Bannerman, and underscored the need for close cooperation with government, NamWater, NamPower, NamPort, contractors, communities, and the tourism sector to deliver the mine on schedule.

Located 30 kilometres southeast of Swakopmund in the Erongo Region, Etango contains a uranium resource of about 207 million pounds U₃O₈ at a 100 parts-per-million cut-off.

Bannerman has invested over 15 years and more than N$1 billion in exploration, feasibility studies, and pilot heap-leach trials.

A Definitive Feasibility Study completed in 2022 confirmed Etango-8 as an economically robust open-pit mine with heap-leach processing, delivering an 87.8 per cent processing yield and a total production of 52.6 million pounds U₃O₈ over an initial 15-year mine life.

The study projected an average annual output of 3.5 million pounds, a post-tax internal rate of return of 21.1%, a net present value of US$390 million, and all-in sustaining costs of US$39 per pound.

Significant early works have been completed.

A 14-kilometre power line has been connected to Erongo RED for construction power, while a 25-kilometre water pipeline from Rössing, complete with an on-site reservoir, is in place.

Bulk earthworks have been undertaken for the primary crusher, as well as secondary and tertiary crushing facilities.

The heap-leach pad—measuring one kilometre in length and 300 metres in width—is taking shape alongside pregnant, barren, and intermediate solution ponds.

Over N$400 million has been spent on electricity, water, and earthworks, with major contracts awarded to Namibian companies including Volta’s Electrical of Swakopmund and Namaplant of Windhoek.

Another N$200 million in civil works and drainage contracts will be awarded in the coming weeks.

The company has already taken delivery of its High-Pressure Grinding Rolls tertiary crusher and completed a 10-day capacity water storage dam.

All environmental and mining licences have been secured.

Employment is projected to grow from approximately 200 contractors in 2024 to around 1,000 during peak construction, before stabilising at 760 once the mine is operational.

Currently, 57 per cent of Bannerman’s core team is female.

The company prioritises Namibian suppliers wherever possible, with significant civil works and heap-leach pad contracts earmarked for local firms.

Although uranium production has not yet commenced, Bannerman has run a corporate social responsibility programme for the past 15 years, focusing on education and tourism.

Initiatives include a partnership with Mondesa Youth Opportunities, collaboration with the Ministry of Education to provide uniforms and support to schools in nine regions, and partnerships with the Namibia Chamber of Environment, TOSCO, the Hospitality Association, and Save the Rhino.

Operating within a national park, Bannerman has also worked closely with the tourism sector to ensure mining and tourism coexist, inviting stakeholders to participate in planning and site visits.

Namibia is the world’s third-largest uranium producer, and Etango-8 is expected to strengthen further the country’s role in global nuclear fuel supply. With uranium prices rebounding to pre-Fukushima levels, the project is positioned to benefit from favourable market conditions.

Share226Tweet142
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Bannerman approves FID for Etango, targets 2028 for yellow cake

Bannerman approves FID for Etango, targets 2028 for yellow cake

October 23, 2026
African Critical Elements targets Karibib lithium production within three years

African Critical Elements targets Karibib lithium production within three years

October 22, 2026
Paladin spends US$11m building uranium stockpiles at Langer Heinrich

Paladin spends US$11m building uranium stockpiles at Langer Heinrich

October 22, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Subscribe now to receive all mining sector and related news!

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

The Extractor Magazine will use the information you provide on this form to be in touch with you and to provide updates and marketing.
Subscribe