• Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
Thursday, September 24, 2026
  • Login
The Extractor Magazine
  • Home
  • News
    • All
    • Africa
    • Biofuels
    • Climate
    • Copper
    • Exploration
    • Lithium
    • Minerals
    • Mining
    • Namibia
    • Nickel
    • Oil & Gas
    • Precious Metals
    • RIGS & VESSELS
    • Silver
    • Uranium
    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

    Ongombo copper mine owner secures £1m convertible loan

    Xinhai Ongombo deal meets all conditions

    Sultan Resources enters Namibia staking claim in the Damara Gold Belt

    Sultan raises A$1.3m to start Namibia copper-gold exploration

    Stamper Oil & Gas resumes trading, expands into Namibia with BISP acquisition

    Stamper cuts Namibia oil asset cash bill by US$750,000

    Koryx nears end of Haib infill drilling as resource update looms

    Koryx hits 438m at 0.40% CuEq as Haib PFS nears

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    TotalEnergies wins 345m-litre Namibia fuel supply deal

    SciAps takes real-time mineral analysis deeper into African exploration

    SciAps takes real-time mineral analysis deeper into African exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    Skeleton Coast Uranium seeks C$5m to fund Namibia exploration

    RCC board investigates procurement behind N$30m fuel deals

    RCC board investigates procurement behind N$30m fuel deals

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

    Trending Tags

  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item
No Result
View All Result
The Extractor Magazine
No Result
View All Result
Home News Uranium

Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate

by Editor
June 18, 2025
in Uranium
0
Snow Lake Energy targets end of 2025 for Engo Valley Uranium Project’s maiden mineral resource estimate
539
SHARES
1.5k
VIEWS
Share on FacebookShare on Twitter

Snow Lake Energy targets the end of 2025 for the completion of the Engo Valley Uranium project’s maiden mineral resource estimate.
The Engo Valley Uranium Project is an exploration-stage project located on the Skeleton Coast of Namibia.
The company reports that its phase 2 drilling program at the Engo Valley Project intercepted 997ppm eU3O8 over a 7-metre interval associated with shale, observed from drill hole ERCH025.
The company also reports another mineralised intersection of 296ppm eU3O8 over a 1.2-metre interval, associated with shale, observed from drill hole ERCH026.
The first segment of the Phase 2 drill program consisted of 31 reverse circulation drill holes, totalling 2,719 metres.
Eight out of the 31 reverse circulation drill holes returned mineralised intersections greater than 100 ppm eU3O8, ranging from 1 metre to 20 metres in width.
Samples from each drill hole have been sent for chemical assays, and results are pending.
The phase 2 drill program is planned to consist of up to 7,500 meters of a combination of reverse circulation and diamond drilling, designed to provide a drill database sufficient to calculate a maiden uranium mineral resource estimate in accordance with JORC (SK-1300).
Snow Lake Energy has scheduled the diamond drilling segment of the Phase 2 drill program to start during the week of June 15, 2025.
A total of 19 diamond drill holes are planned for the MUO, and eight diamond drill holes are planned to be drilled in the D1 area.
Snow Lake Energy CEO Frank Wheatley says initial results from the reverse circulation portion of the drilling program have produced good intercepts of uranium mineralization.
“As we plan the diamond drilling segment of the Phase 2 drill program, we remain on schedule to complete a maiden resource estimate for Engo Valley by year end,” Wheatley says
He says as the global supply deficit of uranium expands, new uranium mines will be required to meet increasing demand.

Share216Tweet135
Editor

Editor

  • Trending
  • Comments
  • Latest
Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

Private company led by John Sisay to revive Tschudi, Otjihase, Matchless and Berg Aukas mines  

February 6, 2024
ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

ReconAfrica to drill first well in the Damara Fold Belt after raising N$238m

April 3, 2024
Gratomic targets 12,000t of vein graphite from Aukam mine this year

Gratomic targets 12,000t of vein graphite from Aukam mine this year

February 3, 2024
Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

Askari Metals puts hopes on Kestrel Pegmatite within the Uis Lithium Project

3
Namibia holds 26 million ounces of silver

Namibia holds 26 million ounces of silver

3
2024 HOPEFULS: Langer Heinrich’s return after five years

2024 HOPEFULS: Langer Heinrich’s return after five years

2
Kaoko opens second Chalkos drill front along 800m Donkey Hill outcrop

Kaoko expands Otniel drilling to 15,000m as second rig starts at Donkey Hill

September 24, 2026
Engineering review identifies pathway to lift Kokoseb plant to 7Mtpa

Engineering review identifies pathway to lift Kokoseb plant to 7Mtpa

September 24, 2026
Ongombo copper mine owner secures £1m convertible loan

Xinhai Ongombo deal meets all conditions

September 23, 2026
  • Home
  • News
  • Magazine
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

No Result
View All Result
  • Home
  • News
  • Magazine
    • Current Edition
    • Previous Editions
  • Climate
  • Minerals
  • Mining
  • All About Namibia’s Extractive Sector
  • Contact
  • Menu Item

Copyright © 2023 The Extractor Magazine. | Powered by: Impeccable Tech & Designs

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In